Quarterly Activities & Cashflow Report
Released
Released
Announcement PDF
DECEMBER 2015 QUARTERLY REPORT
29 JANUARY 2016 ASX ANNOUNCEMENT
QUARTERLY REPORT
FOR THE PERIOD ENDING 31 DECEMBER 2015
HIGHLIGHTS
Deep drilling completed at the Xanadu Gold Project
New Xanadu exploration licence granted
MRG Metals Limited (“MRG” or the “Company”, MRQ.ASX) continued to progress its wholly-owned gold, copper
and base metals projects in Western Australia and Queensland throughout the December 2015 quarter. Despite
the challenging market conditions, MRG was able to continue its exploration efforts and successfully complete its
drilling program at the Xanadu Gold Project (“Xanadu”) and also progress its review of its broader portfolio
including its Queensland IOCG targets to refine future exploration expenditure and rationalisation opportunities.
DEEP DRILLING COMPLETED AT THE XANADU GOLD PROJECT
MRG completed its drilling program at the Xanadu during the December quarter. The receipt of the assay data
was delayed by a shutdown at the analytical laboratory over the Christmas holiday period. MRG has received all
the multi-element data from the late 2015 drilling program which comprised two deep holes that tested
components of an intrusive centred magmatic exploration model, within an 8km prospective zone masked by a
lithocap. The arsenic anomalism was particularly strong in the Big Bend hole, which assayed up to 0.98% arsenic,
however, there were no ore grade gold intercepts, with only trace levels of gold found in both holes.
Analysis of the data and additional 3D modeling is now being undertaken to vector into areas of higher gold
grades. There are four styles of mineralisation at Xanadu that all warrant further drill testing.
1. Mineralisation that is hydrothermally associated with and underlying the lithocap, This target forms an
8km long prospective zone
2. Mt Olympus style mineralisation at Pertinax, associated with steeply dipping fault zones
3. Open pittable disseminated mineralisation occurring in a sedimentary the package directly overlying a flat
lying dolomite unit at Cleopatra.
4. Analogues of Mt Olympus style mineralisation to the southeast of the current project within the newly
granted exploration licence E52/3065
Drilling of deeper holes at Pertinax is the current focus of the next drilling program at Xanadu.
NEW XANADU EXPLORATION LICENCE GRANTED
MRG was granted an additional exploration licence in November 2015, covering additional prospective ground to
the southeast of the current Xanadu project area. The new licence covers c.65km2 and is located 5km due south
of the Mt Olympus mine, covering a similar geological environment. Preliminary geological analysis has
commenced using the Sasak technology to generate targets for on ground exploration.
Managing Director Keith Weston said: “The December quarter saw progress made at the Xanadu gold project.
Although the results did not reveal ore grade gold intersections, the presence of arsenic anomalism and trace
levels of gold provided confirmation of our geological thesis, which gives us confidence that this region contains
additional uncovered gold deposits. We continue to assess and review our portfolio of Sasak-enhanced
exploration prospects and have several workstreams underway to joint venture and/or monetise these assets.”
1
DECEMBER 2015 QUARTERLY REPORT
XANADU PROJECT BACKGROUND
MRG’s Xanadu project is located close to the northern margin of the Ashburton Basin, some 4km west-northwest
of Northern Star’s Ashburton project, (21.3Mt @ 2.4g/t Au for 1.67Moz). The Xanadu mineralisation was
discovered in the mid-1980s by BP Minerals and subject to various phases of exploration in the ensuing period
until acquired by MRG in 2011. Three dimensional structural modelling and a detailed analysis of the exploration
database compiled for MRG by our technical consultants Sasak Technical Services (“Sasak”), provided an
enhanced understanding of geological controls on mineralisation, to better target prospect scale drilling. Drilling
completed during 2015 was based on the targets identified by the Sasak.
YARDILLA
Yardilla straddles the Cundeelee Fault, which separates the Archean Yilgarn Craton from the Proterozoic AlbanyFraser Orogen, Western Australia. The Yardilla project area includes both 100% MRG-owned licences and an
option and purchase agreement over two additional exploration licences, which together cover a contiguous area
of c.220km2 in the southern Fraser Range. The 3 adjoining exploration licences are considered to be prospective
for gold, nickel and base metals. MRG believes the geological setting of Yardilla is similar to that of Tropicana
(114.7Mt grading 1.95 g/t for 7.19Moz Au). MRG has a soil project ready to commence, which will lead to the
targeting of a maiden drilling program.
LOONGANA
MRG holds 2 granted licences that cover the massive Loongana Igneous Complex that lies 500km east of
Kalgoorlie and 60km north of the Trans Australia railway line. It is a large layered mafic and ultramafic intrusive
body that has compelling affinities with the Bushveld Complex in South Africa (820Moz Pt and 720Moz Pd).
The target is grossly under-explored, due to a 250m to 350m covering of younger rocks. Helix Resources Ltd
previously intersected mineralisation (0.72m @ 0.12g/t Pt + Pd) at 270m below surface in broad-spaced scout
drilling that was not followed up at the time. MRG have identified the potential for an 11km long Bushveld-style
PGE reef along strike from the Helix discovery hole. A deep diamond hole drilled by MRG hole in late June 2015
was unsuccessful in testing this “company-maker” exploration target. A package of gabbroic mafic rocks were
detected after drilling through 311m of cover. The targeted horizon was reached at 443m down hole, comprising a
sequence of chromium bearing mafic to ultramafic rocks, containing a 4.5m thick zone of anomalous PGE’s. MRG
received A$108,000 (50% of the drilling cost of the hole) from the Western Australian Government’s Exploration
Incentive Scheme for this drill program.
MRG plans to further drill-test this reef target, along with nickel-copper mineralisation and IOCG targets on the
western side of the complex.
QUEENSLAND IRON OXIDE COPPER GOLD PROJECTS
MRG’s ground holding in the Mt Isa province in western Queensland comprises 5 granted licences, following the
grant of 2 applications in September 2015. 4 of these licences are focused on IOCG targets and one Cannington
style silver-lead-zinc mineralisation. The two remaining IOCG exploration tenement applications, Oban and
Kamileroi, are currently undergoing Cultural Heritage clearance. The new licences all lie under shallow cover,
close to favourable structural positions near existing mines.
MRG is currently re-assessing the geophysical data on these licences and is in joint venture discussions on a
project by project basis.
The current granted licences comprise:
Pulchera
Situated in the Simpson Desert near the Northern Territory border in western Queensland, the Pulchera project
lies 135km north-west of Bedourie. The project lies near the major Toomba Fault, which lies on the south western
edge of the Mt Isa Block, a Proterozoic geological terrain that hosts a diverse range of world class ore bodies.
Previous broad spaced drilling revealed that the depth of cover ranges from a manageable 40m to 100m. Recent
exploration on an adjacent licence returned strongly anomalous results of up to 27m @ 0.4% Cu from 9m
(including 3m @ 2.4% Cu).
2
DECEMBER 2015 QUARTERLY REPORT
Based on spinifex biogeochemical sampling (a method for collecting geochemical data in areas covered by cover
rocks) on an adjacent area to Pulchera, a new mineral province in western Queensland, the Diamantina Alkaline
Province, has recently been identified. The Diamantina Alkaline Province comprises highly differentiated
intrusions that are prospective for platinum group elements and copper.
Mineralisation associated with alkaline intrusives may be present on the Pulchera licence and MRG aims to
pursue this concept in the future. Follow up work can also be carried out on previously carried out research, which
suggests that Olympic Dam style IOCG deposits may occur within a granitic breccia host.
Davenport Downs
Davenport Downs lies 120km south-east of Boulia, Queensland. Like Pulchera, it is close to the interpreted
southern margin of the Mt Isa Block. Davenport Downs straddles a portion of a prominent gravity ridge with
accompanying favourable magnetic signatures. Exploration work undertaken on the tenement to date has
comprised historical data compilation, geophysical data review and prospectivity assessment. This work has
identified two distinct targets on the north-eastern side of the licence.
The Davenport Downs EPM is considered prospective due to its positive magnetic gravity responses, which are
characteristic of IOCG-type deposits in the Mt Isa Block. An exploration co-funding grant of A$75,000 was
obtained from the Queensland government to assist with exploration on the project.
Squirrel Hill
Squirrel Hill is located c.15km west north-west of South32’s Cannington mine (71Mt @170g/t Ag, 4.86% Pb and
3.26% Zn). It lies in a structurally favourable trend between Cannington and the Squirrel Hills granite.
The tenement is covered by a relatively thin, 10m to 40m thick, cover of younger sedimentary rocks, masking the
underlying prospective lithologies.
A program of shallow air-core holes over previously identified geophysical anomalies to identify zones for
subsequent RC drilling would be the logical first step.
Selwyn
Selwyn, recently granted, lies 14km north of South32’s Cannington mine within the Stavely Formation and
comprises brecciated granofels and meta sandstone. Sasak’s predictive modeling technology indicates that this
tenement has potential for IOCG discovery at depth as well as Broken Hill type mineralisation akin to that found at
Cannington.
Mt Angelay
This licence is c.44km southwest of FMR Investments’ Eloise Mine at the junction of two major fault zones in the
meta-sedimentary Soldiers Cap Group. Like Selwyn, Sasak’s predictive modeling technology has identified Mt
Angelay as an IOCG target at depth.
Keith Weston
Managing Director
The information in this summary report, as it relates to Exploration Results is based on information compiled and/or reviewed by Mr. Keith Weston, who is
a member of the Australasian Institute of Mining and Metallurgy (AusIMM).
Mr. Weston is an employee to the Company and has the relevant experience with the mineralisation reported on to qualify as a Competent Person as
defined in the 2012 Edition of the “ Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves “. Mr. Weston consents
to the inclusion in the report of the matters based on the information in the form and context in which they appear.
3
Appendix 5B
Mining exploration entity quarterly report
Rule 5.3
Appendix 5B
Mining exploration entity quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10
Name of entity
MRG METALS LIMITED
ABN
83 148 938 532
31 December 2015
Consolidated statement of cash flows
Cash flows related to operating activities
1.1
Receipts from product sales and related
debtors
1.2
Payments for (a) exploration & evaluation
(b) development
(c) production
(d) administration
Dividends received
Interest and other items of a similar nature
received
Interest and other costs of finance paid
Income taxes paid
Other Drill Funding Grant
1.3
1.4
1.5
1.6
1.7
Net Operating Cash Flows
1.8
1.9
1.10
1.11
1.12
1.13
Cash flows related to investing activities
Payment for purchases of: (a) prospects
(b) equity investments
(c) other fixed assets
Proceeds from sale of:
(a) prospects
(b) equity investments
(c) other fixed assets
Loans to other entities
Loans repaid by other entities
Other (provide details if material)
Net investing cash flows
Total operating and investing cash flows
(carried forward)
+ See chapter 19 for defined terms.
17/12/2010 Appendix 5B Page 1
Current quarter
Year to date
(6 Months)
(121)
(624)
(238)
(460)
1
5
22
117
(336)
(962)
(1)
(1)
(1)
(1)
(337)
(963)
Appendix 5B
Mining exploration entity quarterly report
1.13
Total operating and investing cash flows
(brought forward)
(337)
(963)
-
704
-
704
Net increase (decrease) in cash held
(337)
(259)
1.20
1.21
Cash at beginning of quarter/year to date
Exchange rate adjustments to item 1.20
488
410
1.22
Cash at end of quarter
151
151
1.14
1.15
1.16
1.17
1.18
1.19
Cash flows related to financing activities
Proceeds from issues of shares, options, etc.
Proceeds from sale of forfeited shares
Proceeds from borrowings
Repayment of borrowings
Dividends paid
Other (provide details if material)
Net financing cash flows
Payments to directors of the entity and associates of the directors
Payments to related entities of the entity and associates of the
related entities
Current quarter
$A'000
1.23
Aggregate amount of payments to the parties included in item 1.2
1.24
Aggregate amount of loans to the parties included in item 1.10
1.25
Explanation necessary for an understanding of the transactions
Director Fees, Secretarial Fees, Consulting Fees, & Accounting Fees
$94
NIL
Non-cash financing and investing activities
2.1
Details of financing and investing transactions which have had a material effect on
consolidated assets and liabilities but did not involve cash flows
NIL
2.2
Details of outlays made by other entities to establish or increase their share in projects in
which the reporting entity has an interest
NIL
+ See chapter 19 for defined terms.
Appendix 5B Page 2
17/12/2010
Appendix 5B
Mining exploration entity quarterly report
Financing facilities available
Add notes as necessary for an understanding of the position.
Amount available
3.1
Loan facilities
NIL
3.2
Credit standby arrangements
NIL
Amount used
Estimated cash outflows for next quarter
4.1
Exploration and evaluation
100
4.2
Development
NIL
4.3
Production
NIL
4.4
Administration
100
200
Total
Reconciliation of cash
Reconciliation of cash at the end of the quarter (as
shown in the consolidated statement of cash flows)
to the related items in the accounts is as follows.
5.1
Cash on hand and at bank
5.2
Deposits at call
5.3
Bank overdraft
5.4
Other (provide details)
Total: cash at end of quarter (item 1.22)
+ See chapter 19 for defined terms.
17/12/2010 Appendix 5B Page 3
Current quarter
$
Previous quarter
5
4
146
484
NIL
NIL
NIL
NIL
151
488
Appendix 5B
Mining exploration entity quarterly report
Changes in interests in mining tenements
Tenement
reference
6.1
Interests in mining
tenements relinquished,
reduced or lapsed
6.2
Interests in mining
tenements acquired or
increased
Nature of interest
(note (2))
Interest at
beginning
of quarter
Interest at
end of
quarter
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
7.1
7.2
7.3
7.4
7.5
Total number
Number quoted
NIL
NIL
135,612,115
135,612,115
NIL
NIL
NIL
NIL
Preference
+securities
(description)
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns
of capital, buybacks,
redemptions
+Ordinary
securities
Changes during
quarter
(a) Increases
through issue
(b) Decreases
+Convertible
debt
securities
(description)
Issue price per
security (see
note 3) (cents)
20 cents
Amount paid up
per security (see
note 3) (cents)
20 cents
+ See chapter 19 for defined terms.
Appendix 5B Page 4
17/12/2010
Appendix 5B
Mining exploration entity quarterly report
7.6
7.7
7.8
7.9
7.10
7.11
7.12
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through
securities
matured,
converted
Options
(description and
conversion
factor)
Issued during
quarter
Exercised
during quarter
Expired during
quarter
Debentures
(totals only)
Unsecured
notes (totals
only)
44,007,993
72,978,404
44,007,993
72,978,404
NIL
NIL
NIL
NIL
Exercise price
Expiry date
25 cents
15 cents
21/09/2016
31/08/2020
Compliance statement
1
This statement has been prepared under accounting policies which comply with
accounting standards as defined in the Corporations Act or other standards
acceptable to ASX (see note 5).
2
This statement does give a true and fair view of the matters disclosed.
Sign here:
Date: 29 January 2016
(Director/Company secretary)
Print name:
SHANE TURNER
+ See chapter 19 for defined terms.
17/12/2010 Appendix 5B Page 5
Appendix 5B
Mining exploration entity quarterly report
Notes
1
The quarterly report provides a basis for informing the market how the entit
activities have been financed for the past quarter and the effect on its cash
position. An entity wanting to disclose additional information is encouraged to
do so, in a note or notes attached to this report.
2
6.2) includes options in respect of
interests in mining tenements acquired, exercised or lapsed during the
reporting period. If the entity is involved in a joint venture agreement and
there are conditions precedent which will change its percentage interest in a
mining tenement, it should disclose the change of percentage interest and
conditions precedent in the list required for items 6.1 and 6.2.
3
Issued and quoted securities The issue price and amount paid up is not
required in items 7.1 and 7.3 for fully paid securities.
4
The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of
Mineral Resources and AASB 107: Statement of Cash Flows apply to this report.
5
Accounting Standards ASX will accept, for example, the use of International
Financial Reporting Standards for foreign entities. If the standards used do not
address a topic, the Australian standard on that topic (if any) must be complied
with.
== == == == ==
+ See chapter 19 for defined terms.
Appendix 5B Page 6
17/12/2010