Deep drilling completed at Xanadu and results received
Multiple follow-up targets identified
MRG Metals Limited (“MRG” or the “Company”, MRQ.ASX) is pleased to announce the receipt of drilling results
from the program completed at the Xanadu Gold Project (“Xanadu”) in December 2015. MRG has received all the
multi-element data from the late 2015 drilling program which comprised two deep holes that tested components of
an intrusive centred magmatic exploration model, within an 8km prospective zone masked by a lithocap.
The multi-element assay data, summarised in Appendix 1, supported the visual indications of sulphide
mineralisation observed in the core, with broad zones of elevated pathfinder elements such as arsenic, iron, lead
and antimony, along with the silica replacement of carbonate, which is also a characteristic of Carlin
mineralisation. The arsenic anomalism was particularly strong in the Big Bend hole, which assayed up to 0.98%
arsenic, however, there were no ore grade gold intercepts, with only trace levels of gold found in both holes.
Analysis of the data and additional 3D modeling is now being undertaken to vector into areas of higher gold
grades. There are four styles of mineralisation at Xanadu that all warrant further drill testing.
1. Mineralisation that is hydrothermally associated with and underlying the lithocap, This target forms an 8km long
prospective zone
2. Mt Olympus style mineralisation at Pertinax, associated with steeply dipping fault zones
3. Open pittable disseminated mineralisation occurring in a sedimentary the package directly overlying a flat lying
dolomite unit at Cleopatra.
4. Analogues of Mt Olympus style mineralisation to the southeast of the current project within the newly granted
exploration licence E52/3065
Drilling of deeper holes at Pertinax is the current focus of the next drilling program at Xanadu.
Keith Weston
Managing Director
MRG Metals Limited
+61 428 312 767
keith@mrgmetals.com.au
1
ASX ANNOUNCEMENT
Appendix 1
Table 1 Xanadu program drill intersections
From
To
Interval
Au
As
Fe
Pb
Sb
Hole ID
m
m
m
ppb
ppm
%
ppm
ppm
X5020
397.5
384.0
4.50
54
167
3.36
132
6.0
X5020
414.0
429.0
15.0
32
300
2.59
17
2.2
Inc.
425.0
426.0
1.0
129
158
8.96
119
10.9
Inc.
428.0
429.0
1.0
68
3150
5.86
7
4.6
X5020
519.0
527.0
8.0
27
231
2.53
11
2.7
X5020
542.0
553.0
11.0
58
1730
4.31
5
5.4
Inc.
547.0
550.0
3.0
155
2464
5.40
8
6.4
X5021
245.0
254.0
9.0
51
3289
4.72
11
9.8
Inc.
249.0
250.0
1.0
150
9860
6.53
13
15.6
X5020
15
205
2.27
14
2.0
Average per X5020
X5021
13
574
2.71
11
5.1
Average per X5021
Notes
Table 2 Xanadu Project Collar Locations
Hole ID
Easting
Northing
Elevation
m
m
m
Azimuth
Dip
Hole
584421
7407092
352
088
-84
601.3
582835
7408028
376
178
-49
359.2
Depth
AMPHITHEATRE
X5020
BIG BEND
X5021
Drilling Rig on Hole X5020 - base of Amphitheatre pit
2
Appendix 2.
JORC CODE, 2012 EDITION – TABLE 1 REPORT - XANADU DRILLING
SAMPLING TECHNIQUES AND DATA
Criteria
JORC Code explanation
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, The sampling has been carried out using a combination of Reverse
random chips, or specific specialised industry standard Circulation drilling (RC) with diamond drilling tails, using a multipurpose
measurement tools appropriate to the minerals under drilling rig. Selected samples for assay were derived from diamond drill
investigation, such as down hole gamma sondes, or core that was geologically logged and marked up by the geologist. A total
handheld XRF instruments, etc). These examples of 2 holes were drilled in the program, at depths ranging from of 359.3m to
should not be taken as limiting the broad meaning of 601.3m below surface.
sampling.
Drilling
techniques
Drill
sample
recovery
Commentary
Include reference to measures taken to ensure sample The drill hole collars were located by handheld GPS. Sampling was
representation and the appropriate calibration of any carried out under MRG Metals Ltd protocols and QAQC procedures as
measurement tools or systems used.
per current industry practice. See further details below.
Aspects of the determination of mineralisation that Selected intervals of drill core were cut in half for sampling and these half
are Material to the Public Report.
core samples then assayed. Sample lengths are up to one metre, generating a
In cases where ‘industry standard’ work has been
sample weighing approximately 1 to 3 kg. The sample intervals are always
done this would be relatively simple (e.g. ‘reverse
recorded. At the assay laboratory the samples are crushed to a finer fraction
circulation drilling was used to obtain 1 m samples
(-2mm) and then pulverised to produce a 40 gram sub sample for assaying.
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there is
coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of
detailed information.
A Sandvik UDR 1200 Multipurpose drilling rig, operated by DDH1 Drilling Pty
Drill type (e.g. core, reverse circulation, open-hole
Ltd was used to collect the samples. Hole X5020 was drilled RC to 119.2m,
hammer, rotary air blast, auger, Bangka, sonic, etc)
HQ to 202.0m and NQ2 to 601.3m (EOH). Hole X5021 was drilled RC only to
and details (e.g. core diameter, triple or standard
137.3m and HQ to 359.2m (EOH). No significant assay results were
tube, depth of diamond tails, face-sampling bit or
returned from the those portions of the holes drilled using the Reverse
other type, whether core is oriented and if so, by
Circulation drilling method.
what method, etc).
The operators of the drill rig measure core recoveries for every drill 'run'
Method of recording and assessing core and chip
completed using either a 3 or 6 metre core barrel. The core recovered is
sample recoveries and results assessed.
physically measured by tape measure and the length recovered is recorded
for every metre run. Core recovery can be calculated as a percentage
recovery. Almost 100% recoveries were achieved, with only minor losses in
friable and broken zones, amounting to less than 5% per run. RC chip
recoveries were not considered critical to interpretation of the results and
ranged from 100% down to 50% where strong groundwater inflows effected
recovery of sample.
Measures taken to maximise sample recovery and Diamond drilling collects uncontaminated core samples which are cleaned at
ensure representative nature of the samples.
the drill site, generating clean core for logging and sampling. The total core
samples were dispatched to the assay laboratory where half core was cut for
assay from selected intervals and the second halves stored as reference
sample. Reference samples from the RC drilling were collected and
geologically logged and dispatched to the assay laboratory for storage.
As the core recovery was 100% from the sample intervals that were
Whether a relationship exists between sample
recovery and grade and whether sample bias may assayed, the results are considered to be representative of the interval
have occurred due to preferential loss/gain of fine/ from which they derived.
coarse material.
Logging
Whether core and chip samples have been All drill core & RC chips were geologically logged by MRG geologists, using
geologically and geotechnically logged to a level of the MRG logging scheme.
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in Logging of RC chips and drill core records lithology, mineralogy,
nature. Core (or costean, channel, etc) photography. mineralisation, weathering, colour and other features of the samples. All
samples are cleaned and stored in either core trays & chip trays as
appropriate. These trays were photographed and then stored for future
reference.
The total length and percentage of the relevant
intersections logged.
All holes were logged in full.
Criteria
JORC Code explanation
Commentary
Sub-sampling
techniques and
sample preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
Selected intervals of core were longitudinally cut into two halves using a
diamond core saw, with one half of selected intervals being used for assay.
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
The upper sections of the holes were drilled using the RC method. The
samples were collected via a cyclone into suitable sized receptacle.
Composite samples of the RC samples were assayed as part of this
program but did not return any significant assays.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Samples were prepared at the Bureau Veritas Laboratory in Perth.
Samples were dried, and the whole sample pulverised to 90% passing
75um, and a reference sub-sample of approximately. 200g retained. A
nominal 40g was used for the analysis. The procedure is industry standard
for this type of sample.
Quality control procedures adopted for all subsampling stages to maximise representation of
samples.
A duplicate sample was taken by cutting selected intervals from the core
at a rate of approximately 1 in 90 samples. At the laboratory, regular
Repeats and Lab Check samples are assayed.
Core samples are collected at nominal intervals up to one metre to create 13kg samples for assay. Duplicate samples were collected at a frequency of 1
in 90 samples. At the Laboratory the entire samples were individually crushed
to minus 2mm, split to 200g and then pulverised to 90% passing 75um. The
pulverised portion is used for assay.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/ second-half sampling.
Quality of assay
data and
laboratory tests
Verification of
sampling and
assaying
Whether sample sizes are appropriate to the
grain size of the material being sampled.
Sample sizes are considered appropriate to give an indication of
mineralisation given the particle sizes present in the rock and the
practical requirement to maintain manageable sample weights.
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
The samples were sorted and dried by the assay laboratory. The whole
sample was crushed then pulverised in a vibrating disc pulveriser. Au, Pt,
Pd, Al, Cr, Cu, Fe, K, Mg, Mn, Na, Ni, Ti & Zn were determined by
Inductively Coupled Plasma (ICP) Optical Emission Spectrometry. Ag, As, Bi,
Co, Mo, Pb, Sb, Sn & Zr were determined by Inductively Coupled Plasma
(ICP) Mass Spectrometry.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in
determining the analysis including instrument make
and model, reading times, calibrations factors
applied and their derivation, etc.
No geophysical tools were used in this program.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (i.e.
lack of bias) and precision have been established.
MRG QA/QC protocol for drilling is for Field Standards (Certified Reference
Materials) and Blanks inserted at a rate of 4 Standards and 3 Blanks per
100 single metre samples. Field duplicates were inserted at a rate of
approximately 1 in 90. For this program the relevant samples were part of
a total batch of 277 samples submitted including QC samples. This batch
included 12 Blanks, 11 Standards, and 3 field duplicates. At the Assay
Laboratory additional Repeats, Lab Standards, Checks and Blanks are
analysed concurrently with the field samples. Results of the field and Lab
QAQC samples were checked on receipt of the assays. All assays met
QAQC protocols, showing no levels of contamination or sample bias.
The verification of significant intersections by either
independent or alternative company personnel.
Significant results were checked by the Exploration Manager and
a consultant Geochemist.
The use of twinned holes.
Twin holes were not employed during this part of the program.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
All field logging was carried out on a Panasonic CF-19 Toughbook computer.
Logging data is submitted electronically to the Database Geologist in the
MRG Metals Ltd Victorian office. Assay files are received electronically from
the Laboratory. All data is stored in a Company database system, and
maintained by the Database Manager.
Discuss any adjustment to assay data.
No assay data was adjusted. The lab’s primary Au field is the one used
for analysis purposes. No averaging is employed.
Criteria
JORC Code explanation
Commentary
Location of data
points
Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
Drill hole collars locations were determined by hand-held GPS, with an
accuracy of 5m in Northing and Easting. Down hole surveys were
completed every 50m where practicable during the diamond drilling. No
follow-up down hole directional surveying is planned for these holes.
Specification of the grid system used.
Grid projection is GDA94, Zone 50.
Quality and adequacy of topographic control.
Relative Levels are allocated to the drill hole collars using current
Digital Terrain Model’s for the area . The accuracy of the DTM is
estimated to be better than 10m.
Data spacing for reporting of Exploration Results.
The drilling was designed to pierce geophysical targets. No grid based
drilling was undertaken. Sample were collected only over intervals of
interest and then submitted for assay.
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
This drilling was exploratory in nature and there are no current plans to
utilise the results for Mineral Resource estimation purposes.
Whether sample compositing has been applied.
No sample compositing has been employed.
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the deposit
type.
The targets were selected by interpretation of previous drilling
geochemical & limited geophysical data that has delineated anomalies in
the Proterozoic aged sedimentary rocks. However, the structural
framework is complex and is not well understood due to paucity of prior
deep drilling and masking lithocap. The holes were sited to intersect the
targets based on the current geological information and indications are
that they were drilled orthogonal to the zone of interest.
If the relationship between the drilling orientation
and the orientation of key mineralised structures
is considered to have introduced a sampling bias,
this should be assessed and reported if material.
The orientation of any mineralisation is not known at this stage of
exploration and the holes were drilled to check for the presence of
potentially mineralised structures. Based on this drilling the effect of
drill hole orientation on sampling bias cannot be determined.
Sample security
The measures taken to ensure sample security.
Representative RC samples & all drill core were sealed in appropriate
containers and transported by company vehicle to the Centurion Transport
Depot in Tom Price WA. They were then forwarded by Bureau Veritas to
their Laboratory in Perth for assaying.
Audits or reviews
The results of any audits or reviews of
sampling techniques and data.
Sampling and assaying techniques are industry-standard. No specific audits
or reviews have been undertaken at this stage in the program.
Data spacing and
distribution
Orientation of data
in relation to
geological structure
SECTION 2: REPORTING OF EXPLORATION RESULTS (CRITERIA LISTED IN THE PRECEDING SECTION ALSO APPLY TO THIS SECTION)
Criteria
JORC Code explanation
Mineral tenement
and land tenure
status
Type, reference name/number, location and
ownership including agreements or material issues
with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national park
and environmental settings.
The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area.
Exploration done by Acknowledgment and appraisal of exploration by
other parties
other parties.
Commentary
The drilling occurred within tenements P52/1376 & E52/1378 held by
MRG Metals (Australia) Pty Ltd, a wholly owned subsidiary of MRG
Metals Ltd. The licences are on Vacant Crown Land and are subject to
the Yinhawangka Part B Native Title Claim.
The tenement subject to this report are in good standing with the
Western Australian Department of Mines & Petroleum.
Previous exploration over the Project area has been undertaken by BP
Minerals, Nugold Hill Mines NL / Pelican Resources & Newcrest. Where
relevant, data from these earlier surveys has been incorporated into MRG
databases.
This drilling program at Xanadu was targeted towards two different
targets. Firstly, an interpreted ore ponding environment under a massive
dolomite unit in the Duck Creek Formation and secondly, a feeder zone
for shallow mineralisation at the Big Bend Prospect.
Geology
Deposit type, geological setting and style of
mineralisation.
Drill hole
Information
Refer to tables included in the body of report.
A summary of all information material to the
understanding of the exploration results including
a tabulation of the following information for all
Material drill holes:
easting and northing of the drill hole collar
e lev ation or RL (Re duce d Le ve l – e le v ation
abov e s ea lev e l in m e tr e s) of the dr ill hole
c ollar
dip and azimuth of the hole
down hole length and interception depth
hole length.
If the exclusion of this information is justified on the
basis that the information is not Material and this
exclusion does not detract from the understanding
of the report, the Competent Person should clearly
explain why this is the case.
In reporting Exploration Results, weighting averaging Grades are reported as down-hole length-weighted averages of grades. No
techniques, maximum and/or minimum grade
top cuts have been applied to the reporting of the assay results.
truncations (e.g. cutting of high grades) and cut-off
grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths All higher grade intervals are included in the reported grade intervals.
of high grade results and longer lengths of low grade
results, the procedure used for such aggregation
should be stated and some typical examples of such
aggregations should be shown in detail.
No metal equivalent values are used.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Data aggregation
methods
These relationships are particularly important in the
Relationship
between
reporting of Exploration Results.
mineralisation
If the geometry of the mineralisation with respect to
widths and intercept the drill hole angle is known, its nature should be
reported.
lengths
If it is not known and only the down hole lengths are
reported, there should be a clear statement to this
effect (e.g. ‘down hole length, true width not known’).
The geometry of any mineralisation at depth is not known at this stage. All
assay results are based on down-hole lengths.
Diagrams
No significant discovery is being reported.
Balanced reporting
Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported. These should
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
Refer to results reported in Appendix.
Criteria
JORC Code explanation
Commentary
Other substantive
exploration data
Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
Refer to body of text and this appendix.
Further work
The nature and scale of planned further work (e.g.
tests for lateral extensions or depth extensions or
large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible
extensions, including the main geological
interpretations and future drilling areas, provided
this information is not commercially sensitive.
No further exploration is planned over these tenements.
Share your feedback
Discover