Half Yearly Report and Accounts
Released
Released
Announcement PDF
Half Year Financial Report
MRG Metals Limited
ABN: 83 148 938 532
For the half-year ended 31 December 2025
MRG Metals Limited
Half Year Financial Report
31 December 2025
Page 2
Contents
Corporate Directory 3
Chairman’s Letter 4
Director’s Report 5
Auditor’s Independence Declaration 17
Statement of Profit or Loss and Other Comprehensive Income 18
Statement of Financial Position 19
Statement of Changes in Equity 20
Statement of Cash Flows 21
Notes to the Financial Statements 22
Directors’ declaration 29
Independent Auditor’s Review Report 30
MRG Metals Limited
Half Year Financial Report
31 December 2025
Page 3
Corporate Directory
Directors & Secretary
Andrew Van Der Zwan
Non Executive Chairman
Christopher Gregory
Non Executive Director
Shane Turner
Non Executive Director and Company Secretary
Principal place of business
12 Anderson Street West, Ballarat VIC 3350
Telephone: +61 3 5330 5800 Fax: +61 3 5330 5890
Email: info@mrgmetals.com.au
www.mrgmetals.com.au
Registered office
12 Anderson Street West, Ballarat VIC 3350
PO Box 237, Ballarat VIC 3353
Telephone: +61 3 5330 5800 Fax: +61 3 5330 5890
Corporate accountant and Registered ASIC Agent
RSM Australia Pty Ltd
12 Anderson Street West, Ballarat VIC 3350
PO Box 685, Ballarat VIC 3353
Telephone: +61 3 5330 5800 Fax: +61 3 5330 5890
www.rsm.com.au
Solicitors
Moray & Agnew
Level 6, 505 Little Collins Street, Melbourne VIC 3000
Telephone: +61 3 9600 0877 Fax: +61 3 9600 0894
www.moray.com.au
Share Registry
Automic Pty Ltd
Level 5, 126 Phillip Street, Sydney NSW 2000
Telephone: 1300 288 664
Auditor
William Buck Audit (Vic) Pty Ltd
Level 20
181 William Street, Melbourne Vic 3000
Telephone (office): +61 3 9824 8555
Website: www.williambuck.com
Stock Exchange Listing
ASX Codes: MRQ and MRQOD
MRG Metals Limited
Half Year Financial Report
31 December 2025
Page 4
Chairman’s Letter
MRG Metals is entering a transformative period — and the half year to 31 December 2025 marks
the moment it began.
We are evolving from single heavy mineral sands play into a diversified critical minerals
company specialising in rare earths.
We now have three quality assets advancing concurrently:
1. Garies Rare Earth Project (South Africa) – a high-grade, monazite-hosted system with
simple metallurgy and a fast-track, low-capex development profile
2. Our fully funded Corridor Titanium Oxide Joint Venture, which carries a clear production
pathway to 2027 without requiring MRG to deploy its own capital.
3. Adriano–Fotinho Rare Earth Project (Mozambique) – auger drilling and laboratory results
confirming emerging district-scale rare earth potential
Each project is building momentum.
Garies, acquisition commenced in December 2025, delivers exceptional bulk sample grades of
up to 4.85% TREO with a magnet rare earth composition of ~24% Nd+Pr and simple metallurgy.
The project is highly advanced, sits 70 kilometres from the World's highest-grade rare earth
mine (Steenkampskraal at 14.5% TREO) and the acquisition brings two outstanding industry
executives in Jacob Deysel and Ian Egan on board to support the project.
At Adriano–Fotinho, 37 from 37 auger holes returned visible heavy mineral concentrate and four
alluvial REE zones have been confirmed. With every result, the case for a district-scale rare
earth corridor gets stronger.
Our Titanium Dioxide Joint Venture partner has provided a detailed production plan targeting
early 2027 and will commence ground development ahead of the formal mining licence
transfer. This brings the Company closer to generating cash flows that can be reinvested
across our growing rare earth portfolio.
The coming six months will be catalyst-rich, and I look forward to updating you as we deliver.
On behalf of the Board, I thank you for your ongoing support as we move into this exciting next
chapter.
Andrew Van Der Zwan
Non-Executive Chairman
MRG Metals Limited
MRG Metals Limited
Half Year Financial Report
31 December 2025
Page 5
Director’s Report
The directors present their report, together with the financial statements, on the consolidated
entity (referred to hereafter as the ‘Group’) consisting of MRG Metals Limited (referred to
hereafter as the 'company' or 'parent entity') and the entities it controlled at the end of, or
during, the half-year ended 31 December 2025.
Projects
MRG Metals Limited (ASX: MRQ) (“MRG” or “the Company”) is pleased to release its half-year
report for the period ended 31 December 2025, which represented a period of significant
progress, as the Company continued to execute its strategy to build a diversified critical
minerals portfolio.
During the period, MRG advanced three core assets while also completing the acquisition of
the high-grade Garies Rare Earth Project in South Africa subsequent to period end, which was
agreed to in December 2025.
A significant benefit of the Garies acquisition is the access it provides to experienced
industry executives Jacob Deysel and Ian Egan, both of whom intend to participate in the
recent capital raise, subject to shareholder approval, demonstrating alignment with MRG
shareholders.
The new addition strengthens MRG’s technical and operational capability as theCompany
enters the calendar year with several near-term milestones approaching.
Over the half-year, MRG transitioned from a single-project focus into a diversified Company,
with three high-quality assets progressing concurrently across rare earths and heavy mineral
sands.
These assets included:
1. The Heavy Mineral Sands Joint Venture (Mozambique): A fully funded joint venture
underpinned by a 2.39-billion-tonne JORC resource, with a clear and defined pathway
to initial production targeted within the next 12–18 months.
2. Adriano–Fotinho Rare Earth Project (Mozambique): Ongoing exploration continues
to deliver results consistent with a large, district-scale rare earth system, supporting
the project’s potential scale and long-term significance.
3. Garies Rare Earth Project (South Africa) – A high-grade, monazite-hosted rare earth
system featuringsimplemetallurgyand strongpotentialforalow-capital, accelerated
development pathway.
During Q1 FY26, MRG successfully completed a 3-for-10 Entitlement Offer of listed options (ASX:
MRQOD), exercisable at $0.004 each and expiring in August 2027.
MRG Metals Limited
Half Year Financial Report
31 December 2025
Page 6
The offer raised a total of $817,956, providing additional working capital to advance rare earth
and uranium exploration programs at Adriano, Fotinho and Olinga and to maintain corporate
oversight of the Sinowin Joint Venture in Mozambique. All Directors participated in the
Entitlement Offer in full contributing $48,259, demonstrating continued confidence in the
Company’s long-term growth strategy and project pipeline.
Additionally, during Q2 FY26, MRG also completed a successful capital raise of $0.73 million at
$0.005 per share, reflecting growing support for the Company’s strategy from institutional and
sophisticated investors. Also, MRG Directors and existing Sheerartar Directors intend to place
another $130,000, subject to Shareholder approval. Resolutions for placements are included in
a General Meeting of the Company on 19 March 2026.
High-Grade Garies Rare Earth Project (South Africa)
During the half-year (ASX Announcement23 December 2025), MRG announced the acquisition
of Sheerartar Minerals Pty Ltd, securing ownership of the Garies Rare Earth Project in South
Africa.TheacquisitionrepresentsasignificantexpansionofMRG’srareearthportfolio,adding
a high-grade asset located in a well-established mining jurisdiction, with existing
infrastructure, skilled labour availability and clear permitting pathways.
On 19 January 2026, MRG announced that it has completed the acquisition. Garies is located
approximately 70 kilometres from the Steenkampskraal Monazite Mine, one of the world’s
highest-grade rare earth projects, and displays geological similarities to that rare earth system.
Figure 1: Map showing Strategic location of the Garies’ Rare Earth Projects
MRG Metals Limited
Half Year Financial Report
31 December 2025
Page 7
Bulk sampling undertaken prior to the acquisition returned grades of up to 4.85% TREO,
equatingtoapproximately8%monazite(withmonazitecontaining~60%TREO),placing Garies
among the highest-grade rare earth projects globally on a reported basis.
The rare earth composition is highly favourable, with indicative distributions of:
• Nd + Pr comprising ~24.1% of TREO
• Dy + Tb comprising ~1.4% of TREO
• Heavy rare earth oxides representing ~9% of total REO, including scandium well above
global averages
• High-grade Gallium mineralisation
Rare Earth Market Context & Potential Element Value: Early data for the Garies Project
shows a strong presence of the below elements.
Element Group Indicative Market Value Key Applications
Praseodymium–Neodymium US$108,655/T
Permanent magnets (EVs,
wind, defence)
Dysprosium US$188,550/T
High-temperature &
defence magnets
Terbium US$821,310/T
High-temperature
permanent magnets
(EVs, defence)
Gallium US$230,730/T
Semiconductors, power
electronics
All prices sourced from the Shanghai Metals Market in February 2026
Disclaimer: This is conceptual and illustrative only. It does not represent a valuation, forecast, production target or
economic outcome for the Garies Project. No assumptions are made regarding Mineral Resources, Ore Reserves,
recoveries, costs, revenues or profitability. Any future economic assessment would be subject to further drilling,
metallurgical test work and formal studies in accordance with ASX Listing Rules and JORC (2012). The table features
Indicative spot market references only. Prices volatile. No assumptions regarding recoveries, costs, production, or project
outcomes.
Mineralisation largely occurs in coarse-grained, near-surface bodies, supporting low-strip
open-pit mining. Aeromagnetic modelling indicates plug-like mineralised bodies with vertical
extensions at depth, suggesting strong tonnage potential and continuity.
The system is also associated with high iron content (>60% Fe magnetite), presenting
potential future co-product upside.
A total of 23 exploration targets have been identified across the project area by airborne
magnetic data, with only three targets partially drill tested to date, highlighting substantial
exploration upside.
MRG Metals Limited
Half Year Financial Report
31 December 2025
Page 8
Technical evaluation of the Garies Rare Earth Project has been undertaken by Axiom
Exploration, an independent geological consultancy. Axiom completed a comprehensive
technical report in January 2024, which underpins the geological interpretation, exploration
targeting, and development concepts presented for the project.
Work completed to date includes independent technical assessment by Axiom Exploration
Group Ltd (Canada), aeromagnetic surveys, a limited drilling programme, surface bulk
sampling and laboratory analysis.
Upcoming milestones include delivery of the updated Competent Person’s Report and
completion of a small maiden JORC Resource in Q1 CY26, followed by submission of the
Environmental Assessment and Mining Right application in Q3 CY26.
Figure 2: Indicative timeline of the Garies Project.
The project covers 275 km², including an existing 85 km² permit area with a 190 km² applied
extension. It is well serviced by infrastructure and located approximately 344 km from the
Saldanha Bay deep-water port.
Development is planned in phases:
1. Resource Definition and Permitting: Maiden JORC-compliant resource from
initial targets and conversion of Prospecting Rights to Mining Rights.
2. Pilot Scale Production: Deployment of modestly scaled pilot plant
3. Modular Scalable Expansion: Significant expansion and scalability in
accordance with exploration delivery of future ore.
The processing concept is based on a simple, modular, chemical-free flowsheet, including
crushing, desliming, magnetic separation and gravity separation to produce a high-grade
mixed REE concentrate. Chemical processing is deferred until a later REO conversion stage,
supporting ESG aligned development.
MRG Metals Limited
Half Year Financial Report
31 December 2025
Page 9
On 15 January 2026, the MRG engaged consultants for the Garies Rare Earth Project in South
Africa to progress the Environmental Assessment, Mine Works Programme and Mining Right
application process.
Preparation of the Environmental Assessment and Mining Right Application is well advanced,
with submission expected in Q3 CY26.
Completion and submission of this work represent a material de-risking milestone for the
project as it advances toward permitting and development.
Additionally, subsequent to the half year ended 31st
December 2025, MRG reported that Mr
Colin Rothnie, the project’s independent Competent Person, is in the final stages of preparing
an updated Competent Person Report for Garies.
The report will be supported by final metallurgical analysis from a limited drilling programme
and surface bulk samples by Light Deep Earth Laboratory of South Africa.
This work is directed toward supporting a small maiden JORC (2012) Resource Estimate,
expected in Q1 CY26, forming the foundation for the next phase of technical and permitting
activities.
The acquisition is a scrip deal, with 75 million MRG shares issued on completion and a further
175 million shares issued upon Mining Licence grant.
Further project performance share considerations will align with Garies passing key value
creation milestones, such as delivering a $100M market cap.
Finally, the acquisition company will retain world-class leaders who participated in the recent
capital raise.
Jacob Deysel - Sheerartar Director
• Jacob Deysel is a highly experienced mining executive with over 25 years of global
leadership across large-scale, multi-commodity operations in Africa, Australia, South
America and Europe. He is currently Chief Executive Officer of Critica Limited (ASX:
CRI).
• Jacob has deep expertise across critical minerals, including rare earths, graphite and
heavy mineral sands, with direct experience in projects containing monazite and REE
feedstocks. He has a strong track record of scaling production, delivering capital-
efficient developments, and leading projects through permitting, construction and
steady-state operations.
• Previously, Jacob served as Chief Executive Officer and Managing Director of Mineral
Commodities Ltd (ASX: MRC), Operations Director at Kenmare Resources (LSE: KMR),
andGeneralManager–MiningandPlanningatRioTinto’s Richards Bay Minerals. He has
also held senior leadership roles at Newmont Corporation (NYSE: NEM) and was Vice
President, South America at Uranium Energy Corp (NYSE: UEC).
MRG Metals Limited
Half Year Financial Report
31 December 2025
Page 10
• Jacob is a Mining Engineer with an MBA and has completed executive training at Wits
University and London Business School. He is recognised for applying innovative, lean
operating strategies that reduce capital intensity, improve margins and unlock long-
term value. His experience across ASX, LSE andNYSE-listed companies brings strong
capability in governance, stakeholder engagement and disciplined execution.
Ian Egan - Sheerartar Minerals Executive Chairman
• Ian Egan is a highly experienced mining executive with extensive expertise across
mining operations, marketing, finance and project development, with a particular
focus on African jurisdictions. He has held senior executive roles at BHP, including
Group General Manager – BHP Titanium Minerals and General Manager – Non-Ferrous
Metals, where he was responsible for large-scale international operations and
marketing activities.
• Ian has also served on the boards of a number of listed and unlisted resource
companies, including Kenmare Resources, Golconda Gold, Ok Tedi Mining, and Orbital
Corporation. His board experience spans project development, capital allocation,
governance and stakeholder management across multiple commodities and
jurisdictions.
• Ian brings deep commercial and operational insight, particularly in mineral sands and
titanium-related industries, and has a strong track record in guiding projects from
development through to production. His experience across African mining
environments and global markets provides valuable strategic and governance
capability.
Early Exploration Work Showed Adriano–Fotinho Rare Earth Corridor Has District-Scale
Potential (Mozambique)
MRG Metals reported strong exploration results from its 100%-owned Adriano Rare Earth
Project and commenced exploration at the adjacent Fotinho licence (ASX Announcements 12
December 2025 and 17 December 2025), supporting a large, connected, district-scale rare
earth corridor.
Adriano results below.
• At Adriano, auger drilling and sampling completed between October and December
2025 delivered consistently high-grade results from multiple alluvial targets.
• A total of 37 auger holes and 126 samples were completed, with 100% of holes
returning visible heavy mineral concentrate (HMC).
• Laboratory analysis of 125 samples returned high to very high Total Heavy Mineral
(THM) grades, including 83 samples grading above 4.0% THM and 26 samples grading
above 6.0% THM.
• Individual samplesreturnedgradesof upto9.56% THM over1.0 metre, whilefive auger
holesrecorded weighted average grades exceeding6.0% THM, includinga peak result
of 7.16% THM over 2.0 metres in hole AAG25011.
MRG Metals Limited
Half Year Financial Report
31 December 2025
Page 11
These results align with the October 2024 stream sediment testing, which returned 100%
anomalous results across 42 samples, with 74% exceeding 1,000ppm TREO, a peak grade of
32,393ppm TREO, and a strong magnetic rare earth component of ~22%.
The drilling confirmed four separate alluvial deposit areas; all aligned with historic high-grade
TREO stream anomalies.
Following receipt of the initial laboratory results, MRG completed a further nine auger holes
at a fifth alluvial target located in the south-east of the Adriano licence.
Drilling at this target returned strong visual HMC responses in multiple pan concentrates,
reinforcing the scale of the alluvial system and further strengthening the interpretation of a
broader mineralised catchment hosting monazite-rich gravel.
In parallel, geological mapping across the Adriano licence identified and sampled multiple
pegmatitebodiesalonga3-kilometretrend.Thesepegmatitesoccurwithinthesamedrainage
system feeding the alluvial zones and are interpreted as potential primary rare earth source
rocks shedding monazite-rich material into downstream gravels.
Laboratory results from pegmatite samples, together with magnetic separation and
subsequent mineralogical analysis to determine the composition of the Heavy Mineral
Concentrate (HMC), are expected in early 2026.
Pending these results, the next phase of systematic auger drilling, trenching and continued
pegmatite mapping across both licences will be refined and progressed.
During the half-year, exploration also commenced at the Fotinho licence (11000L) following
completion of the administrative and community public participation process and receipt of
approval to begin work.
The Fotinho program is designed to test the continuity of mineralisation observed at
Adriano, including whether themapped alluvial channels and pegmatite trend extends
across both licences.
Taken together, the auger drilling results, high-grade THM assays, pegmatite mapping and
shared drainage patterns support MRG’s view that Adriano and Fotinho may form a single,
connected mineralised system with both alluvial and hard-rock rare earth potential.
This work underpins the Company’s interpretation of the Adriano–Fotinho area as a district-
scale rare earth corridor, with further laboratory results expected to guide the next phase of
exploration.
Fully Funded 2 Billion Tonne Heavy Mineral Sands Project: Funds Continued to Be Deployed &
Government Review Signals Licence Transfer (Mozambique)
During the half-year (ASX Announcement 26 November 2025), MRG’s Joint Venture
partner, Sinowin Lithium, continued to deploy funds from the first US$3 million tranche
MRG Metals Limited
Half Year Financial Report
31 December 2025
Page 12
of itsUS$6 million fundingcommitment to advancetheMozambiqueHeavy Mineral Sands
Joint Venture.
The proactive deployment of funds during the period ensured that key development
activities progressed in parallel with regulatory approvals.
Additionally, the Mozambican Government commenced a review of the Joint Venture
Company’s financial accounts, a procedural step that typically precedes completion of
the mining licence transfer process.
This review provides a strong indication that the licence transfer process is progressing
toward completion for Corridor Central (11142C) and Corridor South (11137C), alongside
finalisation of the Environmental and Social Impact Assessment (ESIA). On 27 January
2026 theESIA was approvedforCorridor Central.
Both Corridor Central and Corridor South hold granted mining licences, with Corridor
Central granted in January 2025 and Corridor South granted in June 2025.
The Joint Venture is working closely with Mozambique’s National Mining Institute (INAMI)
to address final site-specific requirements at Corridor South, including the identification
andexclusionof affectedareasandcommencementof compensationdiscussionswhere
required.
This process is expected to have minimal impact on initial mine development and early
years of operation.
The Joint Venture partner also formalised its initial production planning, with Sinowin
setting a first-year Heavy Mineral Concentrate (HMC) production target of 130,000 to
160,000 tonnes per annum commencing March 2027 and a five-year ramp-up target of
800,000 tonnes per annum.
Sinowin has also advised that port capacity requirements could increase to
approximately 360,000 tonnes per annum as external rail and port infrastructure is
developed.
The Corridor Heavy Mineral Sands Project is supported by a combined 2.39 billion tonne
JORC Mineral Resource, comprising 1,534 million tonnes at 5.5% THM at Corridor Central
and 860 million tonnes at 4.9% THM at Corridor South.
The project benefits from established regional infrastructure, including sealed road
access, proximity to grid power, and the nearby Port of Chongoene, located
approximately 20 kilometres from Corridor Central and nearing operational readiness.
Current expenditure during the half-year focused on pre-construction readiness
activities.
MRG Metals Limited
Half Year Financial Report
31 December 2025
Page 13
Work included procurement planning, completion of the Environmental and Social
Impact Assessment, and resettlement planning, electrical infrastructure coordination
with Electricidade de Moçambique (EDM) and ongoing in-country operational
management.
A key feature of the Joint Venture structure is that Sinowin, as operator, is responsible
for all offtake arrangements.
This approach removes the need for MRG to independently secure offtake agreements,
avoids the requirement for a pilot plant, and leverages Sinowin’s established commercial
networks to support multiple offtake pathways as production ramps up.
MRG Metals Completed $0.73 Million Placement to Advance Rare Earth and Heavy
Mineral Sands Portfolio
During the half-year (ASX Announcement 23 December 2025), MRG completed a$0.73 million
placement to sophisticated and professional investors, issuing 146 million fully paid ordinary
shares at $0.005 per share, together with free attaching options.
In addition, the Board of Directors of MRG and the Directors of Sheerartar Minerals Pty
Ltd committed a further $130,000, subject to shareholder approval, demonstrating
strong alignment with shareholders and confidence in the Company’s strategy.
Funds raised during the placement are being applied toward completion of the
Sheerartar Minerals acquisition, advancement of the Garies Rare Earth Project toward
grantof aMiningLicence, continued exploration acrosstheAdriano–Fotinho.
Rare Earth Corridor, support of the Mozambique Heavy Mineral Sands Joint Venture, and
general working capital.
Entering 2026, MRG Metals Limited is positioned to advance multiple assets in parallel
across rare earths and heavy mineral sands, with several near-term technical and
regulatory milestones expected to further define value across the portfolio.
Collectively, the momentum building across MRG’s portfolio reflects a focused execution
strategy, with2026 expected to deliver aseries of technical, permitting anddevelopment
milestones.
West Australian Lithium Projects were on Care and Maintenance during the period
awaiting Native Heritage Clearance.
MRG Metals Limited
Half Year Financial Report
31 December 2025
Page 14
TENEMENTS:
The Tenements held by the Company at 31 December 2025 are as follows:
Project Tenement
%
Owned
Held for Sale
Note
Norrliden K nr 1 10
Malanaset nr 100 10
Malanaset nr 101 10
Corridor Central 11142C 100
Held for Sale Mining
Concession
Corridor South 11137C 100
Held for Sale Mining
Concession
Corridor North 10779L 100 Held for Sale
Linhuane 7423L 100 Held for Sale
Marao 6842L 100 Held for Sale
Adriano 11002L 100
Fotinho 11000L 100
Olinga 11005L 100
Lake Johnston E63/2394 100 Application
Lake Johnston E63/2446 100 Application
Forrestania E77/3164 100 Application
The information in this report, as it relates to Mozambique Exploration Results is based on information
compiled and/or reviewed by Mr JN Badenhorst, who is a member of the South African Council for Natural
Scientific Professions (SACNASP) and the Geological Society of South Africa (GSSA). Mr Badenhorst is a
contracted consultant of the Company and has sufficient experience which is relevant to the style of
mineralisation and type of deposits under consideration and to the activity which has been undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves”. Mr Badenhorst consents to the inclusion in this
report of the matters based on the information in the form and context in which they appear.
Forward Looking Statement
All statements other than statements of historical fact included in this announcement including, without
limitation, statements regarding future plans and objectives of MRG Metals Ltd (‘MRG’ or ‘Company’) are
forward-looking statements. When used in this announcement, forward-looking statements can be
identified by words such as ‘’anticipate”, “believe”, “could”, “estimate”, “expect”, “future”, “intend”, “may”,
“opportunity”, “plan”, “potential”, “project”, “seek”, “will” and other similar words that involve risks and
uncertainties. These statements are based on an assessment of present economic and operating
conditions, and on a number of assumptions regarding future events and actions that, as at the date of this
announcement, are expected to take place. Such forward-looking statements are not guarantees of future
performance and involve known and unknown risks, uncertainties, assumptions and other important
factors, many of which are beyond the control of the Company, its Directors and management of MRG that
could cause MRG’s actual results to differ materially from the results expressed or anticipated in these
statements. The Company cannot and does not give any assurance that the results, performance or
achievements expressed or implied by the forward-looking statements contained in this announcement will
actually occur and investors are cautioned not to place undue reliance on these forward-looking
statements. MRG does not undertake to update or revise forward-looking statements, or to publish
prospective financial information in the future, regardless of whether new information, future events or any
other factors affect the information contained in this announcement, except where required by applicable
law and stock exchange listing requirements.
MRG Metals Limited
Half Year Financial Report
31 December 2025
Page 15
Director details
The following persons were directors of MRG Metals Limited during the whole of the financial
half-year and up to the date of this report, unless otherwise stated:
• Mr Andrew Van Der Zwan
• Mr Christopher Gregory
• Mr Shane Turner
Principal activities
During the period, the principal activities of entities within the Group were exploration and
development of Heavy Mineral Sands and Rare Earth Elements in Mozambique.
Review of operations and financial results
The operating result from continuing operations of the Group for the half year was a loss of
$385,374 (31 December 2024 loss $309,976). The operating result from discontinued operations
of the Group for the half year was a loss of $11,529 (31 December 2024 loss $310,602).
Earnings per share from continuing operations during the half year were (0.01 cents) (31
December 2024 (0.01 cents)). Earnings per share from discontinued operations during the half
year were (0.00 cents) (31 December 2024 (0.01 cents)).
Significant changes in the state of affairs
On 1 July 2025, it was announced that the Corridor South HMS Mining Licence was granted.
On 18 July 2025, an Entitlement Offer to Shareholders was announced. This was a pro-rata non-
renounceable 3 for 10 entitlement offer of options at $0.001 per option. During the period, the
full Entitlement Offer of $817,956 was completed and resulted in the issuance of 817,955,241
MRQOD Options with an exercise price of $0.004 and an expiry date of 19 August 2027.
On 23 December 2025, it was announced that the Group had entered into an agreement to
acquire a 70% interest in the High-Grade, Magnet-Rich Garies Rare Earth Project in South
Africa. An initial issue of 75 million ordinary shares is required once the acquisition is finalised,
which are escrowed for 12 months. A Placement of $730,000 was also announced, with the
main use of funds to be applied to advance the Garies Project to the grant of a mining licence.
This resulted in the issue of 146 million s