MRG Metals Limited (ASX: MRQ) (“MRG” or “the Company”) is pleased to release its Q4
FY25 report, as it continues to advance its fully funded two billion tonne Heavy Mineral
Sands (HMS) project.
Over the quarter, MRG advanced its landmark Joint Venture (JV) with Sinowin Lithium
(Sinowin), under which Sinowin is fully funding the development of MRG’s Mozambique
Heavy Mineral Sands Projects. The JV is targeting initial production of 110,000 tonnes
per annum (tpa) of HMS concentrate in the next 12-18 months, scaling up to 440,000
tpa in future stages.
The Company is now awaiting final Mozambican Government approval to transfer the
Corridor Central and Corridor South licences into the JV entity. Once complete, this will
trigger the first US$3 million tranche of Sinowin’s US$6 million commitment.
Notwithstanding the delay in formal transfer, Sinowin continues to fund activities to
move the Project to production.
To date, Sinowin has already invested greater than US$1 million into the Joint Venture
and is continuing to finance the current/ongoing operating costs. Additionally, under
the JV, Sinowin committed to a binding drag-along clause for the potential acquisition
of MRG’s Joint Venture equity at a minimum of US$50 million, showcasing the much
greater potential value of MRG’s Mozambique assets.
Corridor South Mining Licence – Granted Providing a Clear Avenue to Production
On 26 June 2025, the Mozambican National Mining Institute (INAMI) formally approved
the Corridor South Mining Licence (11137) — a major de-risking milestone for the
Corridor Sands Project.
The Corridor South licence, directly complements the Corridor Central Mining Licence
(11142C) granted on 7 January 2025, which contains the high-grade Koko Massava
deposit (103 Mt @ 6.6% THM).
Together, the Corridor South and Corridor Central licences form the foundation of the
combined 2 billion tonne JORC Resource and Exploration Target; underpinning the Joint
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
Venture. This resource base supports the initial 110,000 tonnes per annum production
phase, which is expected to commence within the next 12–18 months.
Key points:
• JORC Resource: Corridor South hosts 257 Mt @ 6.0% THM at a 5.0% cut-off
grade, within a global resource of 860 Mt @ 4.9% THM.
• Target Production Timeline: 12–18 months to first production, with preconstruction planning already underway.
• MRG Equity in the JV:
30% free-carried to 220 KT pa of Heavy Mineral
Concentrate (HMC); reducing to 25% free-carried to 440KT pa HMC; flooring at
20% for HMC production above that.
• Operational Scale: Sinowin has advised the Chongoene rail and industrial wharf
consortium that JV production targets are increasing to 360,000 tonnes in Year
1, with a five-year goal of 800,000 tonnes per annum.
• Funding Secured: All development and operating costs to this stage — including
permitting, environmental and in-country management — are being covered by
Sinowin, reflecting strong commitment from the JV operator.
• Ongoing Work: MRG and Sinowin are actively progressing all necessary preproduction activities to ensure the project is ready to proceed as soon as the
licence transfer is approved. Sinowin remains committed to fully funding this
workstream.
Linhuane Licence Granted – High Grade Asset is Fully Funded in Stage 2 of the JV
The Linhuane Exploration Licence (7423L) was granted on 2 May 2025, covering 56.38
km² along an 18km palaeodune system.
Key points:
• The licence was recently granted by the Mozambique Mining Department
(INAMI), reflecting regulatory support and a secure foundation for long-term
development.
• The Linhuane project’s minimum expenditures are funded by Sinowin, with
development to commence when it is added to the JV at Phase Two, once annual
concentrate production reaches 220,000 tonnes.
• The Linhuane project contains continuous, near-surface zones of HMS and is
within proximity of Corridor Sands.
• Exceptionally high Total Heavy Mineral grades, ranging from 5% to 25%.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
•
•
THM at shallow depths (up to 10.5m), with standout drill results such as 10.5m
@ 15.6% THM and 10m @ 17.9% THM.
Such grades are well above industry averages and have the potential to add
substantial value to the JV.
The Company recently launched an Entitlement Offer to raise additional funds to further
advance this project, which it believes is a World-class asset — ‘a company maker in its
own right’.
Sinowin Fully Managing Project Delivery
Sinowin Lithium has taken control of JV field operations in early 2025 and is now driving
the development roadmap, including:
• Funding all costs associated with licensing, permitting, exploration,
management and early works.
• EDM (Mozambique’s state utility) has confirmed electricity supply for Year 1
production with ~US$820,000 in JV capex committed for substation and line
connection. Expansion planning is underway to meet the staged ramp-up.
• EIAS Study (contracted at >US$500k) expected to complete in 2025, after minor
delays due to post-election disruption.
• In parallel, Sinowin is progressing pre-construction engineering works and
procurement to meet the 12–18 month production timeline, supported by incountry staff and approvals from key government bodies.
JV Equity structure Update
• The Hong Kong Joint Venture Company (JVC), Terriland, is established with
Sinowin Lithium (HK) Co Ltd and Sinowin Lithium Cobalt Ltd (SLC) collectively
holding 70% and MRG 30%.
• Terriland owns 100% of a newly established UAE company, Tailan Mining Ltd
(UAE). The transfer of MRG’s Mozambique companies, Sofala Mining &
Exploration LDA (SME) and Sofala Mining and Exploration 1 LDA (SME1), which
hold Corridor Central and Corridor South Mining Licence applications, is pending
Government approval.
• Terriland awaits tax treatment from the Mozambique Government and transfer
clearance from INAMI.
o Note: Following Government restructure of INAMI and Cabinet shuffle,
INAMI has been closed for transitional items until 31 August 2025. We
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
•
•
anticipate prompt progression in early September and will advise
accordingly.
When the Chinese Government completes the Overseas Direct Investment (ODI)
approval, the JV bank account is established and SME and SME1 companies
complete the share transfer; SLC will deposit the first USD$3 million into the Joint
Venture (JV) Trust Account for mine development and operations. SLC continue
to fund operations in the meantime.
Subsequently, the JVC will own Corridor Central and Corridor South via
ownership of the Mozambique Holding Companies (SME and SME1).
Sinowin to Lead Offtake Agreements
A key strength of MRG’s Joint Venture structure with Sinowin Lithium is the complete derisking of the offtake strategy — often a major barrier for early-stage resource projects
in frontier markets.
Unlike most junior-led developments, where offtake must be secured before funding or
construction, the MRG-Sinowin JV structure delegates all offtake responsibilities to
Sinowin. This structure:
• Removes the need for MRG to source offtake partners or negotiate long-term
contracts independently
• Eliminates the requirement for a pilot plant — avoiding up to US$10 million in
CAPEX and associated delays
• Streamlines project delivery by avoiding complex sampling and testwork
logistics
• Leverages Sinowin’s established commercial network in China to secure
multiple offtake options and downstream engagement
This strategic alignment enables MRG to focus entirely on delivering its resource and
project development milestones, while Sinowin manages the critical path to sales and
cashflow.
Environmental Impact Assessment Study (EIAS)
EIAS with contract value in excess of USD$500,000 (refer ASX Announcement 8
November 2024):
• Progresses after 6-8 week delay associated with social unrest.
• Planned completion moved to mid Q3, 2025.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
Electrical supply
• The JV has requested power supply from Electricidade de Moçambique, E.P.
(EDM), a state-owned energy company of Mozambique. EDM has confirmed
capacity for year 1, with transmission line and substation connection costs of
circa USD$0.82 million.
• Supply in years 2 and 3 will be at higher levels with a planned plant expansion to
require substation work, with Capex commitments from EDM/JV approaching
USD$2 Million.
• The confirmation of year 1 supply is a significant benefit as the JV will be able to
evaluate the best approach for plant expansion, while knowing Stage 1 plant
requirements can be met by local supply.
Marao Project – High Grade Surface HMS Confirmed by Laboratory Assays
MRG’s Magonde target within the Marao licence (6842L) continued to deliver strong
results.
Highlights from the recent infill auger program include:
• Laboratory assay results confirming standout mineralisation: 24MUHA048
returned 4.0% THM to 13.5m depth; 24MUHA070 returned 3.4% THM to 13.5m
depth.
• Individual sample grades as high as 4.57% THM.
• Average THM assay grades were 8% higher than visually estimated values.
• Valuable Heavy Mineral (VHM) content confirmed at 48.16%, including rutile,
zircon, and ilmenite.
• Geological continuity confirmed across 100-hole program totalling 1,350m.
• Potential to support a future JORC-compliant resource.
These results validate Magonde’s inclusion as a future JV asset, scheduled to be
transferred into the JV once Stage 3 production is underway.
Entitlement Offer to Shareholders
Post-quarter-end, 18 July 2025, MRG announced an equity raising of approximately
$817,956 through a pro-rata non-renounceable 3 for 10 entitlement offer of options to
eligible shareholders in the Company (Entitlement Offer).
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
With its 2-billion-tonne Mozambique Heavy Mineral Sands Projects already fully funded
and a clear roadmap to initial production of 110,000 tonnes per annum, the Company
believes this capital raise will be instrumental in advancing its other Rare Earth and
Heavy Mineral Sands projects.
The offer price for the Entitlement Offer is $0.001 (0.1 cents) per New Option (Offer Price).
Under the Entitlement Offer, eligible shareholders will be able to subscribe for 3 New
Options for every 10 existing fully paid ordinary shares held at 7.00 pm (Melbourne time)
on Friday 25 July 2025 (Record Date) at the Offer Price.
The New Options are exercisable at $0.004 (0.4 cents) and will have an expiry date of 19
August 2027.
The indicative closing date of the Entitlement Offer is 5:00 pm Friday 15 August 2025.
If applications received for New Options under the Entitlement Offer are less than the
number of New Options available under the Entitlement Offer, the Directors reserve the
right to place the shortfall at their discretion within 3 months of close of the Entitlement
Offer.
Key Statistics of the Offers
Item
Quantum
Offer Price per New MRQOD Option
$0.001 (0.1 cents)
Entitlement Ratio (based on existing Shares)
Number of Shares currently on issue
3:10
2,726,518,626
Existing Options on issue as at date of the Prospectus
1,075,922,556
– exercisable at $0.008 on or before 31 December
2025)
New MRQOD Options to be issued under the Offers
Gross proceeds of the issue of New
MRQOD Options under the Offers (assuming all
Entitlements are accepted)
817,955,588
$817,956
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
The funds raised under the Entitlement Offer will be used by the Company for the
following:
(a) Linhuane HMS Project – auger drilling, mineralogy and metallurgy to test high
grade historical HMS targets – $100,000;
(b) Adriano Rare Earth Element & Thorium Project – follow up of stream sediment
anomalies, auger drilling, mineralogy and metallurgy - $100,000;
(c) Fotinho Rare Earth Element & Thorium Project – stream sediment sampling, auger
drilling and mineralogy - $75,000;
(d) Olinga Uranium Project – stream sediment sampling, auger drilling and mineralogy
- $75,000; and
(e) Tenement Maintenance, working capital and costs of the equity raise - $467,956.
Indicative Timetable
Action
Date
Announcement of the Offers
Friday 18 July 2025
Lodgement of Prospectus with ASIC and ASX
Friday 18 July 2025
Notice sent to Ineligible Shareholders
Friday 18 July 2025
Notice sent to Optionholders
Friday 18 July 2025
Ex Date
Thursday 24 July 2025
Record Date for determining Entitlements
Friday 25 July 2025
Prospectus despatched to Eligible Shareholders and
Company announcement of despatch
Tuesday 29 July 2025
Opening date of the Offers
Tuesday 29 July 2025
Last day Company can extend the Closing Date*
Tuesday 12 August 2025
Closing Date of the Entitlement Offer at 5:00 pm*
Friday 15 August 2025
Securities quoted on a deferred settlement basis
Monday 18 August 2025
Announcement of results of the Entitlement Offer
Wednesday 20 August 2025
Shortfall Offer closes#
Thursday 13 November 2025
Issue date of New MRQOD Options and lodgement of
Appendix 2A with ASX applying for quotation of the New
MRQOD Options
Wednesday 20 August
2025
New MRQOD Options issued under the Offers commence
trading on a normal settlement basis**
Friday 22 August 2025
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
Dates may change
*The above dates are indicative only and are subject to change. The Company reserves
the right to amend any or all of these dates and times subject to the Corporations Act,
the ASX Listing Rules and other applicable laws. Any change to dates and times will
have a consequential effect on subsequent dates. The Company also reserves the right
not to proceed with the Offer at any time.
**Quotation of the New MRQOD Options is subject to the Company being able to
satisfy ASX of the quotation requirements set out in Chapter 2 of the ASX Listing Rules.
#The Directors may vary the closing date of the Shortfall Offer without notice.
AUSTRALIA
No work was carried out at the Company’s Australian assets this quarter.
ZIMBABWE
Sighter Metallurgical testwork is underway at SGS laboratory in Johannesburg, South
Africa, on phosphate(P2O5) mineralised samples taken from one of 4 main phosphate
targets that were generated in the Shawa carbonatite complex (refer ASX Announcement
21 March 2025). The targets were developed from a soil and outcrop sampling program,
with individual samples then collected for this Sighter Metallurgical study from surface
exposures. The results from the study are expected by early August.
ASX ADDITIONAL INFORMATION
The Company provides the following information pursuant to ASX Listing Rule
requirements:
ASX Listing Rule 5.3.1: Exploration and Evaluation Expenditure spend during the quarter
was $95,912. Full details of exploration activity during the quarter are set out in this
report.
ASX Listing Rule 5.3.2: The Company confirms that there was no mine production and
development activities during the quarter.
ASX Listing Rule 5.3.5: Payment to related parties of the Company during the quarter
was $29,877 in cash. Payments to each Director for director and consulting fees and
superannuation were $9,292. Payment to Director Shane Turner for Accounting services
was $2,000.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
TENEMENTS
The Tenements held by the Company at 30 June 2025 are as follows:
Project
Tenement
%
Owned
Norrliden
K nr 1
10
Malanaset
nr 100
10
Malanaset
nr 101
10
Corridor Central
11142C
100
Mining
Concession
Corridor South
11137C
100
Mining
Concession
Corridor North
10779L
100
Linhuane
7423L
100
Marao
6842L
100
Adriano
11002L
100
Fotinho
11000L
100
Olinga
11005L
100
Lake Johnston
E63/2394
100
Application
Lake Johnston
E63/2446
100
Application
Forrestania
E77/3164
100
Application
Note
Authorised by the Board of MRG Metals Ltd.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
For more Information please contact:
MRG Metals
Andrew Van Der Zwan
Chairman
M: +61 (0) 400 982 987
E: andrew@mrgmetals.com.au
Investor Relations
Angus Kennelly
Massive Intelligence
E:angus@massiveintelligence.com.au
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but
are not limited to, statements concerning the Company’s planned exploration program and
corporate activities. When used in this document, the words such as “could”, “plan” “estimate”,
“intend”, “may”, “potential”, “should” and similar expressions are forward-looking statements.
Although the Company believes that its expectations reflected in these forward-looking statements
are reasonable, such statements involve risks and uncertainties and no assurance can be given that
actual results, events and outcomes achieved will be consistent with these forward looking
statements.
Competent Persons’ Statement
The information in this report, relating to Mozambique and Zimbabwe Exploration Results is based on
information compiled and/or reviewed by Mr JN Badenhorst, who is a member of the South African Council
for Natural Scientific Professions (SACNASP) and the Geological Society of South Africa (GSSA). Mr
Badenhorst is a consultant of the Company and has sufficient experience which is relevant to the style of
mineralisation and type of deposits under consideration and to the activity which has been undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves”. Mr Badenhorst consents to the inclusion in this
report of the matters based on the information in the form and context in which they appear.
The information in this report, relating to West Australian Lithium Exploration Results is based on
information compiled and/or reviewed by Mr Andrew Hawker, who holds a Bachelor of Science (Geology);
is a Member of the AusIMM and the AIG. Mr Hawker is a consultant of the Company and has sufficient
experience which is relevant to the style of mineralisation and type of deposits under consideration and to
the activity which has been undertaken to qualify as a Competent Person as defined in the 2012 Edition of
the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr
Hawker consents to the inclusion in this report of the matters based on the information in the form and
context in which they appear.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
MRG METALS LIMITED
ABN
Quarter ended (“current quarter”)
83 148 938 532
30 June 2025
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
(a) exploration & evaluation
Year to date
(12months)
$A’000
-
(106)
(d) staff costs
(20)
(194)
(e) administration and corporate costs
(78)
(454)
-
5
(b) development
(c) production
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Government grants and tax incentives
1.8
Other (Management Fees)
-
161
1.8
Other (Reimbursement of Expenses)
-
49
1.9
Net cash from / (used in) operating
activities
(98)
(539)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(96)
(514)
(a) entities
(b) tenements
(c) property, plant and equipment
(d) exploration & evaluation
(e) investments
(f)
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(12months)
$A’000
Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (Reimbursement of Exploration)
-
101
2.6
Net cash from / (used in) investing
activities
(96)
(413)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
801
-
(15)
-
786
3.2
Proceeds from issue of convertible debt
securities
3.3
Proceeds from exercise of options
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
3.5
Proceeds from borrowings
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (Funds on Trust)
3.10
Net cash from / (used in) financing
activities
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
388
360
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(98)
(539)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(96)
(413)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
786
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date
(12months)
$A’000
194
Current quarter
$A’000
194
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
11
119
5.2
Call deposits
183
269
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
194
388
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
22
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
8
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Director Fees, Secretarial Fees, Consulting Fees, & Accounting Fees.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
NIL
NIL
7.1
Loan facilities
7.2
Credit standby arrangements
7.3
Other (please specify)
7.4
Total financing facilities
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
98
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
96
8.3
Total relevant outgoings (item 8.1 + item 8.2)
194
8.4
Cash and cash equivalents at quarter end (item 4.6)
194
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
$A’000
0
194
1.0
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Yes.
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Yes. Entitlement Offer to raise $818K announced 18 July 2025.
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Yes. Entitlement Offer to raise $818K announced 18 July 2025.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
31 JULY 2025
Authorised by: THE BOARD OF MRG METALS LTD
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.