Quarterly Activities & Cashflow Report
Released
Released
Announcement PDF
31 JULY 2015 ASX ANNOUNCEMENT
QUARTERLY REPORT
FOR THE PERIOD ENDING 30 JUNE 2015
HIGHLIGHTS
• 1,568m drill program successfully completed at Xanadu
• Deep drill hole completed at Loongana
• Preparations underway for Mt Isa geophysics and IOCG drilling in 2H 2015
CORPORATE
• Discussions with strategic partners continue to progress
• $613,373 research & development claim received
• Sasak relationship extended
MRG Metals Ltd (“MRG”) is pleased to announce the successful completion of drilling at its Xanadu and Loongana
projects, located in Western Australia. Xanadu is a prospective gold target approximately 4km west southwest of
Northern Star’s Ashburton project. Loongana is a Platinum Group Elements (“PGE”) plus gold project located east
of Kalgoorlie.
XANADU DRILLING PROGRAM OVERVIEW
During the June quarter, two separate drilling programs were successfully completed at Xanadu, focusing on two
prospective gold targets: Cleopatra and Pertinax.
Drilling at Cleopatra comprised further holes to the northeast of the existing drill holes over the eastern and western
ends of the Pertinax prospect (Figure 1). The drilling at Cleopatra was testing the potential for small, shallow open pit
developments on a series of anomalous gold targets.
At Pertinax drilling was directed to testing multi-element soil anomalies outlined by sampling of an area with similar
geological settings to the +1Moz Mt Olympus deposit (within the Ashburton project owned by Northern Star) to the
east. Early results from Pertinax confirm the existence of a mineralised zone with multi-element geochemical signatures
akin to the nearby Mt Olympus. MRG is now in receipt of the first series of assay results from the Laboratory and they
are currently being assessed.
Managing Director Keith Weston said: “The June quarter saw the completion of two exciting drilling programs at our
Xanadu and Loongana projects in Western Australia. The Xanadu drilling campaigns at the Cleopatra and Pertinax
gold targets confirm the prospectivity of the project. This is an important initial step in MRG’s strategic goal of defining
and developing shallow gold targets over the Xanadu project. Our priority is to accelerate sampling at both prospects
to enhance our understanding of the gold endowment over the area. It is particularly pleasing that the first holes
at Pertinax indicate the presence of significant mineralisation, a fantastic result for MRG and the Sasak Predictive
Technology”
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
Phone: +61 3 5330 5800 / Fax: +61 3 5333 1667
www.mrgmetals.com.au / info@mrgmetals.com.au
JUNE 2015 Quarterly Report
Xanadu – Cleopatra Prospect
Previous drilling at Cleopatra in mid-2014 returned wide mineralised intercepts including 23m @ 1.14 g/t Au from
21m down hole in X4017 & 41m @ 0.44g/t Au from 20m down hole in X4018 (see ASX announcement 22 July 2014).
The current program was testing the potential for shallow open pit deposits on a series of anomalous gold targets
flanking a major anticlinal fold axis. The additional holes drilled in this campaign demonstrated the presence of similar
structural and lithological traps for mineralising fluids, where a shallow dipping horizon of calcareous sediments hosts
disseminated gold above a massive dolomite unit. The region of near surface mineralisation covers an area of 300m
wide x 400m long, which remains open in both the north and south direction.
Xanadu – Pertinax Prospect
Drilling at Pertinax was directed to testing multi-element soil anomalies in an area with a similar geological setting to
the Mt Olympus mine, which lies to the east. Four orientation lines were drilled at the eastern and western ends of
this 1.2km long zone, revealing a new mineralised area with multi element geochemical signatures akin to adjacent
deposits. The central portion of this zone remains untested and recent soil sampling indicates that it remains open
along strike to the northwest for a further 2km. The trend is displaced by cross faulting towards the southeast.
Paraburdoo
35km
Pertinax Drilling
P 52/1372
7410000mN
P 52/1373
Waugh
P 52/1374
P 5201375
Claudius
P 52/1376
Sparta
P 52/1377
Amphitheatre
•Newman
Caesar
P 52/1379
Zeus
Stynes
P 52/1366
Cleopatra Drilling
P 52/1378
XANADU
Mt.Olympus
Peake
P 52/1367
Cleopatra
P 52/1368
P 52/1380
P 52/1381
7405000mN
P 52/1369
PERTH•
580000mE
585000mE
590000mE
XANADU GOLD PROJECT
MRG Tenement
Prospect
Nanjilgandy Fault
TENEMENTS OVER SATELITE IMAGE
Northern Star Tenements
Pit
Soil Sampling
MRG METALS LTD. July 2015. Map Grid of Australia GDA 94 ZONE 50 K
595000mE
0
1.0
2.5km
Figure 1. Xanadu tenement outline showing recent drilling and soil sampling.
MRG’s Xanadu project is located close to the northern margin of the Ashburton Basin, some 4 kilometres west
southwest of Northern Star’s Ashburton Project (21.3Mt @ 2.4g/t Au for 1.67Moz). The Xanadu mineralisation was
discovered in the mid 1980’s by BP Minerals and has been subject to various phases of exploration in the ensuing
period until MRG’s acquisition in 2012.
2
JUNE 2015 Quarterly Report
LOONGANA DRILLING PROGRAM OVERVIEW
A deep ‘proof of concept’ hole, seeking a PGE reef style target in the Loongana Igneous Complex was completed at
the end of the June quarter.
After initial rotary drilling through covering rocks comprising limestones and shales, Proterozoic basement rocks were
intersected 310m below surface. The basement consisted of mafic and ultramafic rocks, predominantly gabbros and
pyroxenties with strong primary igneous layering, of alternating elevated chromium and titanium rich bands. These
features are typical of stratiform reef-style PGE deposits.
Kalgoorlie • LOONGANA
PERTH•
LNGD003
LOONGANA PROJECT
Drillhole Collars Over TMI
2015 MRG Drillhole
0
Figure 2.
3
4km
MRG METALS LTD.
JUNE 2015.
Map Grid of Australia
GDA 94 ZONE 50
Historical Drillholes
JUNE 2015 Quarterly Report
• Mount Isa
SQUIRREL HILL
• Longreach
PULCHERA
DAVENPORT DOWNS
BRISBANE•
0
QUEENSLAND IOCG PROJECTS
Tenements Over Bouguer Gravity
MRG METALS LTD.APRIL 2015. Map Grid of Australia GDA 94 ZONE 54 K
Figure 3.
4
MRG new application
MRG existing licences
Mine
25
50
100km
JUNE 2015 Quarterly Report
Representative samples from the drilling are currently being processed by the assay laboratory and results are
expected shortly.
Costs up to $108,000 – 50% of the drilling cost – will be covered by the West Australia Government’s Exploration
Incentive Scheme. MRG is in receipt of the first tranche of funds from the scheme and is appreciative of this funding to
assist cutting edge exploration.
QUEENSLAND IRON OXIDE COPPER GOLD PROJECTS
MRG’s IOCG ground holding in the Mt Isa province in Queensland comprises 3 granted licences and the recent
acquisition of 4 exploration tenement applications from Sasak Minerals Pty Ltd (“Sasak”) – Kamileroi, Oban, Mt Angelay
and Selwyn (Figure 3).
The 4 new applications were obtained via the Project Generation Agreement between MRG and Sasak and were
selected using Sasak’s in-house predictive analytical targeting techniques for IOCG deposits. They cover high potential
targets on open ground, within the prospective Mt Isa Block and lie under shallow cover, close to favourable structural
positions near existing mines.
On ground exploration is soon to begin on the two granted tenements. MRG was recently awarded $75,000 for
deep drilling on the Davenport Downs licence, as part of the Queensland Government’s Collaborative Drilling Initiative
Scheme. Accordingly, landowner & heritage clearances have commenced as a precursor to drilling on this project and
at Pulchera.
CORPORATE
Research & Development claim received
On 10 April 2015 MRG received a tax offset cash payment of $613,373 pursuant to the Australian Government’s
Research and Development (“R&D”) Tax Incentive Scheme.
MRG appreciates the Australian Government’s continued support for the R&D Tax Incentive Scheme, which provides
valuable financial assistance to MRG, who undertakes innovative and technically challenging mineral exploration
research. The refund will be used to fund MRG’s 2015 exploration programs.
Relationship extended with Sasak
On 1 April 2015, MRG announced the extension of the Technical Services Agreement and a new Project Generation
Agreement for a further term of 2 1/2 years.
Commensurate with the strong relationship developed over the previous 2 years between MRG and Sasak, and the
joint belief in the projects within MRG’s portfolio, it was agreed that no upfront payments were necessary to reach
agreement. Sasak remains committed to driving success of the exploration portfolio and will continue to provide the
technology to do so.
MRG looks forward to the continuing relationship and future exploration success.
Keith Weston
Managing Director
The information in this summary report, as it relates to Exploration Results is based on information compiled and/or reviewed by Mr Keith Weston, who is a member of the
Australasian Institute of Mining and Metallurgy (AusIMM).
Mr Weston is an employee to the Company and has the relevant experience with the mineralisation reported on to qualify as a Competent Person as defined in the 2012
Edition of the “ Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves “. Mr Weston consents to the inclusion in the report of the
matters based on the information in the form and context in which they appear.
5
JUNE 2015 Quarterly Report
Appendix 5B
Mining exploration entity quarterly report
Rule 5.3
Appendix 5B
Mining exploration entity quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10
Name of entity
MRG METALS LIMITED
ABN
Quarter ended (“current quarter”)
83 148 938 532
30 June 2015
Consolidated statement of cash flows
Cash flows related to operating activities
1.1
Receipts from product sales and related
debtors
1.2
Payments for (a) exploration & evaluation
(b) development
(c) production
(d) administration
Dividends received
Interest and other items of a similar nature
received
Interest and other costs of finance paid
Income taxes paid
Other – Govt Drilling Grant
Other – Research & Development Claim
1.3
1.4
1.5
1.6
1.7
1.7
Net Operating Cash Flows
1.8
1.9
1.10
1.11
1.12
1.13
Cash flows related to investing activities
Payment for purchases of: (a) prospects
(b) equity investments
(c) other fixed assets
Proceeds from sale of:
(a) prospects
(b) equity investments
(c) other fixed assets
Loans to other entities
Loans repaid by other entities
Other (provide details if material)
Net investing cash flows
Total operating and investing cash flows
(carried forward)
+ See chapter 19 for defined terms.
6
17/12/2010 Appendix 5B Page 1
Current quarter
$A’000
Year to date
(12 Months)
$A’000
(106)
(698)
(279)
(871)
7
23
23
613
113
613
258
(820)
-
(9)
-
(9)
258
(829)
JUNE 2015 Quarterly Report
Appendix 5B
Mining exploration entity quarterly report
1.13
Total operating and investing cash flows
(brought forward)
258
(829)
0
0
Net increase (decrease) in cash held
258
(829)
1.20
1.21
Cash at beginning of quarter/year to date
Exchange rate adjustments to item 1.20
152
1,239
1.22
Cash at end of quarter
410
410
1.14
1.15
1.16
1.17
1.18
1.19
Cash flows related to financing activities
Proceeds from issues of shares, options, etc.
Proceeds from sale of forfeited shares
Proceeds from borrowings
Repayment of borrowings
Dividends paid
Other (provide details if material)
Net financing cash flows
Payments to directors of the entity and associates of the directors
Payments to related entities of the entity and associates of the
related entities
Current quarter
$A'000
1.23
Aggregate amount of payments to the parties included in item 1.2
1.24
Aggregate amount of loans to the parties included in item 1.10
1.25
Explanation necessary for an understanding of the transactions
Director Fees, Secretarial Fees, Consulting Fees, & Accounting Fees
$100
NIL
Non-cash financing and investing activities
2.1
Details of financing and investing transactions which have had a material effect on
consolidated assets and liabilities but did not involve cash flows
NIL
2.2
Details of outlays made by other entities to establish or increase their share in projects in
which the reporting entity has an interest
NIL
+ See chapter 19 for defined terms.
7
Appendix 5B Page 2
17/12/2010
JUNE 2015 Quarterly Report
Appendix 5B
Mining exploration entity quarterly report
Financing facilities available
Add notes as necessary for an understanding of the position.
3.1
Loan facilities
3.2
Credit standby arrangements
Amount available
$A’000
NIL
Amount used
$A’000
NIL
Estimated cash outflows for next quarter
$A’000
200
4.1
Exploration and evaluation
4.2
Development
NIL
4.3
Production
NIL
4.4
Administration
100
300
Total
Reconciliation of cash
Reconciliation of cash at the end of the quarter (as
shown in the consolidated statement of cash flows)
to the related items in the accounts is as follows.
5.1
Cash on hand and at bank
5.2
Deposits at call
5.3
Bank overdraft
5.4
Other (provide details)
Total: cash at end of quarter (item 1.22)
+ See chapter 19 for defined terms.
8
17/12/2010 Appendix 5B Page 3
Current quarter
$A’000
Previous quarter
$A’000
5
68
405
84
NIL
NIL
NIL
NIL
410
152
JUNE 2015 Quarterly Report
Appendix 5B
Mining exploration entity quarterly report
Changes in interests in mining tenements
Tenement
reference
6.1
Interests in mining
tenements relinquished,
reduced or lapsed
6.2
Interests in mining
tenements acquired or
increased
Nature of interest
(note (2))
East Exploration
Yilgarn
E38/2773
Interest at
beginning
of quarter
Interest at
end of
quarter
100%
0%
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
7.1
7.2
7.3
7.4
7.5
Total number
Number quoted
NIL
NIL
135,612,115
135,612,115
NIL
NIL
NIL
NIL
Preference
+securities
(description)
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns
of capital, buybacks,
redemptions
+Ordinary
securities
Changes during
quarter
(a) Increases
through issue
(b) Decreases
+Convertible
debt
securities
(description)
Issue price per
security (see
note 3) (cents)
20 cents
Amount paid up
per security (see
note 3) (cents)
20 cents
+ See chapter 19 for defined terms.
9 Appendix 5B Page 4
17/12/2010
JUNE 2015 Quarterly Report
Appendix 5B
Mining exploration entity quarterly report
7.6
7.7
7.8
7.9
7.10
7.11
7.12
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through
securities
matured,
converted
Options
(description and
conversion
factor)
Issued during
quarter
Exercised
during quarter
Expired during
quarter
Debentures
(totals only)
Unsecured
notes (totals
only)
44,007,993
44,007,993
NIL
NIL
NIL
NIL
Exercise price
Expiry date
25 cents
21/09/2016
Compliance statement
1
This statement has been prepared under accounting policies which comply with
accounting standards as defined in the Corporations Act or other standards
acceptable to ASX (see note 5).
2
This statement does give a true and fair view of the matters disclosed.
Sign here:
Print name:
(Director/Company secretary)
SHANE TURNER
+ See chapter 19 for defined terms.
17/12/2010 Appendix 5B Page 5
10
Date: 31 July 2015
JUNE 2015 Quarterly Report
Appendix 5B
Mining exploration entity quarterly report
Notes
1
The quarterly report provides a basis for informing the market how the entity’s
activities have been financed for the past quarter and the effect on its cash
position. An entity wanting to disclose additional information is encouraged to
do so, in a note or notes attached to this report.
2
The “Nature of interest” (items 6.1 and 6.2) includes options in respect of
interests in mining tenements acquired, exercised or lapsed during the
reporting period. If the entity is involved in a joint venture agreement and
there are conditions precedent which will change its percentage interest in a
mining tenement, it should disclose the change of percentage interest and
conditions precedent in the list required for items 6.1 and 6.2.
3
Issued and quoted securities The issue price and amount paid up is not
required in items 7.1 and 7.3 for fully paid securities.
4
The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of
Mineral Resources and AASB 107: Statement of Cash Flows apply to this report.
5
Accounting Standards ASX will accept, for example, the use of International
Financial Reporting Standards for foreign entities. If the standards used do not
address a topic, the Australian standard on that topic (if any) must be complied
with.
== == == == ==
+ See chapter 19 for defined terms.
11
Appendix 5B Page 6
17/12/2010
Share your feedback
Discover