JUNE 2024 QUARTERLY ACTIVITY REPORT
KEY HIGHLIGHTS:
EVENTS SUBSEQUENT TO THE QUARTER:
SLC/MRG Joint Venture
• A Hong Kong Joint Venture Company has been established.
• A UAE Subsidiary Company is in the process of being established.
• Documentation required for the Transfer of the Mozambique Companies has been prepared.
• The timing of the Transfer will be dependent upon Mozambique Regulatory approvals.
• SLC and MRG are working together in good faith to progress the Joint Venture.
• SLC continues to fund all costs associated with the Joint Venture.
• On behalf of the Joint Venture, MRG/Sofala representatives met with the new Director of INAMI
on 19 July 2024. The Meeting was well received with INAMI looking forward to our resubmission based on the revised Production Model of the Joint Venture and indicated a
commitment to work together to progress the Mining Licence application expediently.
• Discussions have commenced on progressing an Environmental Impact Assessment.
EVENTS DURING THE QUARTER:
MOZAMBIQUE
• On 12 June 2024, MRG entered into a Binding Joint Venture Agreement (JVA) with Sinowin
Lithium (HK) Co., Ltd and SINOWIN Lithium Cobalt (ShenZhen) Ltd to develop its Mozambique
Corridor Sands projects and other Mozambique Heavy Mineral Sands projects. Full terms of the
agreement are included in this report.
• Corridor Heavy Mineral Sand (HMS) Mine Development has continued during the quarter:
o Significant new local infrastructure within or adjacent to MRG’s Corridor HMS
tenements provides significant, positive economic impact to the projects:
▪ A new regional airport in Corridor South tenement is now operational.
▪ A new HMS loading jetty now under construction at Chongoene, 26km from
MRG’s likely mine start-up operation at Nhacutse deposit.
▪ A new Chibuto to Maputo powerline now under construction, crossing both
Corridor Central and South tenements, running beside the existing tarred
road; and
▪ A new network of cell phone towers now operational and providing full
coverage throughout the Corridor Central and South licences.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
•
•
Adriano 11002L Exploration
o On the ground stream sediment sampling has started.
o Environmental Management Plan completed; all provincial and local government, as
well as community engagement completed.
o Drainage pattern analyses completed; 35 stream sediment samples planned.
o Open file satellite imagery sourced.
Olinga 11005L Exploration
o Uranium and Rare Earth Element (“REE”) Olinga Exploration Licence 11005L granted.
o Environmental Management Plan has been initiated; all provincial and local
government, as well as community engagement will take place in May 2024.
o Drainage pattern analyses completed.
o Open file satellite imagery sourced.
o Ground exploration to commence with stream sediment sampling in June 2024.
ZIMBABWE
• Completion of Phase 2 - Ground Exploration at the Shawa Carbonatite Project in Zimbabwe
returns highly anomalous portable XRF (pXRF) results from 376 outcrop and 670 soil samples:
o Phosphorous up to 48,405 ppm (4.84% P) in outcrop and 12,598 ppm (1.26% P) in
soil.
o Strontium up to 8,076 ppm in outcrop and 1,204 ppm in sieved soil samples.
o Iron up to 632,512 ppm (63.25% Fe) in outcrop and 288,960 ppm (28.90% Fe) in soil.
o Barium up to 248,970 ppm (24.90% Ba) in outcrop and 36,390 ppm (3.39% Ba) in soil;
and
o Niobium up to 427 ppm in outcrop and 963 ppm in soil.
• Other exploration activities at Shawa Carbonatite Project included:
o Mapping of all 10 Wickbury mining licences completed.
o 351 outcrop and sub-crop samples collected during mapping and pitting program.
o Soil sampling grid program completed; 644 samples collected.
o Phosphate, vermiculite, magnetite and magnesite identified during mapping and
sampling.
o Outcrop, sub-crop and soil samples prepped at an accredited Zimbabwe preparatory
laboratory.
o Sample export applications currently with Zimbabwe government departments for
approval. Samples will be assayed in South Africa.
AUSTRALIA
• Encouraging pXRF anomalism from first pass soil sampling at the Lake Johnston and
Forrestania lithium projects in Western Australia
• Follow-up soil sampling is planned at Lake Johnston North lithium project.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
MRG Metals Limited (“MRG” or “the Company”) (ASX Code: MRQ) is pleased to provide its June 2024
Quarterly Activity Report.
During the quarter, MRG signed a Binding Joint Venture Agreement with Sinowin Lithium (HK) Co., Ltd
and SINOWIN Lithium Cobalt (ShenZhen) Ltd to develop its Mozambique Corridor Sands projects and
other Mozambique Heavy Mineral Sands projects. The Company also continued its exploration programs
across its multi-commodity portfolio located in Mozambique, Zimbabwe and Western Australia.
MOZAMBIQUE
JOINT VENTURE AGREEMENT SIGNED TO DEVELOP HMS PROJECTS
On 12 June 2024, MRG entered into a Binding Joint Venture Agreement (JVA) with Sinowin Lithium (HK)
Co., Ltd and SINOWIN Lithium Cobalt(ShenZhen)Ltd (“SLC”) to develop its Mozambique Corridor
Sands projects (Corridor Central and Corridor South) and its other Mozambique Heavy Mineral Sands
(“HMS”) projects.
Highlights
Under the agreement, MRG is to be free carried, including all capital expenditure and operating
expenditure, through to 440,000 tonnes of annual concentrate production. MRG shall retain equity of
30% of the JV Company(s) through mine start-up at 110,000 tonnes of annual concentrate production,
reducing during production expansion to a floor equity of 20% when the JV production has grown to
440,000 tonnes of annual concentrate.
MRG and SLC had earlier entered into a Non-Binding Memorandum of Understanding (“MOU”) on 6
March 2024. SLC sent geological, construction and design teams to Mozambique in April 2024 to carry
out Due Diligence and commence design work.
The Due Diligence was successfully completed in early May 2024. The parties worked together in good
faith to finalise the formal Joint Venture Agreement, including the JV Company(s) structure, on terms
consistent with the Non-Binding MOU.
SLC will provide an initial USD$80,000, representing two months payment for MRG’s part in progressing
JV operations, while the formal processes of setting up the JV Company(s) are completed. This initial
payment comprises USD$15,000 per month to the MRG Board, together with an estimated USD$25,000
per month to cover in-country costs in Mozambique, the use of funds to assist with grant of the Mining
Licence Applications and development of the Project.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
Upon setting up the JV Company(s), SLC will provide an immediate initial investment of USD$3 million
and once spent, an additional USD$3 million to progress mine approvals, design and project economic
analysis into construction phase.
SLC and MRG have been working together during the Due Diligence period to fast track the necessary
feasibility and mine design plans required to update the Mining Licence applications. A Feasibility Study
has progressed substantially and will be finalised shortly.
A Joint Venture Company (“JVC”) based in Hong Kong has been established.
MRG has agreed to a drag-along clause, with a conditional acquisition of MRG’s JVC equity for a
minimum of USD$50 million.
Through this joint venture, MRG is partnering with a company with prior international (Canada) mine
development experience and the funding necessary to bring a mine to production without external
funding (Refer “About SLC” below).
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
Figure 1: MRG Team and SLC Team during Due Diligence. L-R: Luis Sitoe (MRG’s local Senior Geologist),
SLC Team Member, Kobus Badenhorst (MRG’s Head Geologist), SLC Team Member, Stephanie Walker
(MRG’s In Country Manager) and SLC Team Member.
Key Terms of the JV are:
-
All parties signed the binding JVA on 12 June 2024.
-
JV Expenditure
o SLC to fund all JV expenditure through mining operation and production expansion up to
and beyond the agreed targets and includes:
o Deposit of USD$3 million dollars into the JV trust account.
o Initial two monthly payments of USD$40,000 have been made available in the interim as
formal Joint Venture Companies and Bank accounts are set up in the various jurisdictions.
i) Working capital to cover MRG’s in-country costs estimated at USD$25,000 for 6 months
will be funded until the JVC puts in place the necessary personnel and corporate structure.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
o
-
ii) MRG Management involvement in JV at USD$15,000/month for minimum of 12
months.
SLC during its in-country Due Diligence, coordinated engineering and construction
consultants to fast track the next steps of mine development:
▪ To complete the mine feasibility report for the Initial Corridor Project;
▪ To design the engineering and construction plan of the Initial Corridor Project; and
▪ To get the Mining Licence approval from the Mozambique Government.
JV Equity structure
o Effective immediately, upon receipt of the initial USD$3 million working capital funding,
SLC shall hold 70% of JV equity and MRG 30% of JV equity. The JVC shall own Corridor
Central and Corridor South via ownership of the Mozambique Holding Companies
o Stage 1: After the JV has achieved 110,000 tonnes of annual concentrate production,
Stage 1 shall be achieved within 21 months of receipt of Mining Licence/s. Milestone
benefit: Corridor North is added to the JVC.
o Stage 2: After the JV has achieved 220,000 tonnes of annual concentrate production,
Stage 2 shall be achieved within 2 years after Stage 1. Milestone Benefit: SLC increases
equity to 75%. MRG reduces equity to 25% and Linhuane is added to the JV.
o Stage 3: After the JV has achieved 440,000 tonnes of annual concentrate production,
Stage 3 shall be achieved within 5 years after Stage 1. Milestone Benefit: SLC increases
equity to 80%. MRG reduces equity to 20% and Marao is added to the JVC.
o SLC shall invest all funds necessary to develop the initial mining operation up to an annual
concentrate production of 440,000 tonnes. Further expansion will be funded by the JVC
but MRG’s equity in the JV will not be diluted below 20%. It is anticipated the JVC will
have the financial capacity to fund such further expansion, or have the capacity to arrange
debt financing as needed.
Key Terms of the Offtake Agreement
- SLC shall be the Offtaker for all HMS products from the Initial Corridor Sands Project.
- The offtake price will be fixed with reference to the export prices of the same quality HMS which
is being processed by other companies in Mozambique and the JV shall coordinate an
independent review mechanism agreeable to both Parties.
- The JV company shall pay 5% sales commission for the offtake agreement.
About SLC:
Sinowin Lithium (HK) Co., Ltd and SINOWIN Lithium Cobalt (ShenZhen) Ltd were the investing
companies involved with Guo Ao Lithium Ltd (GAL), a Canadian-based company. Guo Ao Lithium Ltd
was established in December 2016, focusing on mining investments and operating mining
development projects, especially in seeking and developing strategically valuable mineral resources
globally. In December 2017, the company acquired 60% equity of the Moblan lithium mine project for
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
USD$60 million from its wholly-owned subsidiary, Global Star, based in Peru. Following the completion
of the acquisition, the company immediately commenced comprehensive mining development and
operations, including in-depth geological exploration, rigorous feasibility studies, comprehensive
environmental impact assessments, and detailed drilling analysis, laying a solid foundation for the
project. After years of meticulous operation and development, in October 2021, the company sold
60% equity of the Moblan lithium mine project for USD$86.5 million, achieving significant investment
returns.
Since GAL is a Canadian company, SLC has been formed in Hong Kong to avoid multiple country
jurisdictions. SLC has reserved capital generated from the sale in Canada and has identified the
Corridor Sands project as its key focus for re-investment of the funds.
JV Properties and Definitions
- Corridor Projects means Heavy Mineral Sands projects in Mozambique including Corridor Central
(11142C), Corridor South (11137C), Corridor North (10779L), Linhuane (7423L) and Marao (6842L).
- “Initial Project” means the first of the Corridor Projects chosen by the JV for commencement of
mining and production.
Figure 2: MRG’s Heavy Mineral Sands Projects
CORRIDOR HEAVY MINERAL SANDS
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
During the quarter, significant critical infrastructure upgrades have been completed or were being
undertaken on and around the MRG Corridor HMS projects in the Chibuto to Xai-Xai area:
• The new Filipe Jacinto Nyusi Airport situated on the Corridor South licence is now operational
with flights to and from Maputo (Figure 3).
• New jetty under construction 26km from Nhacutse deposit at Chongoene (Figure 4).
• New Chibuto to Maputo powerline being constructed crossing the Corridor Central and South
licences, adjacent to the existing tarred road crossing the two licences (Figure 5); and
• Numerous new cell phone towers constructed on the Chibuto to Xai-Xai area, including
adjacent to the existing tarred road on the Corridor Central and South licences (Figure 6).
Figure 3: New operational Filipe Jacinto Nyusi Airport situated on the Corridor South licence.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
Figure 4: New HMS loading jetty under construction at Chongoene
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
Figure 5: New Chibuto to Maputo powerline being constructed crossing the Corridor Central and South
licences licence, with tarred road adjacent to power lines.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
Figure 6: New cell phone towers situated on the Corridor South licence, adjacent to the tarred road.
ADRIANO
On the ground exploration as per the Work Program (refer ASX Announcement 18 December 2023) has
started at Adriano (Figure 7), with a stream sediment sampling program of 35 samples (Figure 8)
expected to be completed late April 2024. The stream sedimentary sample positions were guided by a
drainage pattern interpretation (Figures 8 and 10). A stream sediment geochemistry and mineralogical
study will be undertaken on the drainage samples generated, with results expected next quarter. All
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
open-file satellite imagery were obtained to assist in exploration, with historical aerial radiometric data
re-interpreted to generate targets on Adriano (Figure 9).
CES Environmental and Social Advisory Services has completed an Environmental Management Plan; all
provincial and local government, as well as community engagements have been completed.
Figure 7: Map of the location of MRG’s new granted Adriano 11002L REE Exploration licences and
Olinga 11005L Uranium and Rare Earth Exploration licences (EL); with the port city of Quelimane in
close proximity.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
Figure 8: Map showing MRG’s Adriano 11002L with the drainage pattern interpretation and planned
stream sediment samples.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
Figure 9: Map showing MRG’s Adriano 11002L with reimaged airborne radiometric spectrometer data
of a regional national airborne geophysical survey and generated target areas, Th response shown.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
Figure 10: Images of stream sediment sampling taking place at Adriano 11002L.
OLINGA
At the Olinga License, all open-file satellite imagery were obtained to assist in exploration, with the
historical aerial radiometric data re-interpreted to generate targets (Figure 9 with U shown) and a
drainage pattern interpretation has been completed (Figure 10).
CES Environmental and Social Advisory Services has commenced an Environmental Management Plan;
all provincial and local government, as well as community engagements were conducted in May 2024.
It is estimated that following the completion of the Environmental Management Plan, on-the-ground
exploration will commence in June 2024 with a stream sediment sampling program.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
Figure 11: Map showing MRG’s Olinga 11005L with reimaged airborne radiometric spectrometer data
of a regional national airborne geophysical survey, U response shown.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
Figure 12: Map showing MRG’s Olinga 11005L with the drainage pattern interpretation.
During the quarter, MRG announced that the Olinga Exploration Licence 11005L was successfully
granted over potential Uranium (U) and Rare Earth Element (REE) mineralised area in Mozambique.
Olinga 11005L has an area of 16,534.47 ha and is situated 890 km North-East of the Company’s Corridor
Central (11142C) and Corridor South (11137C) Heavy Mineral Sands (HMS) Mining licence applications
(MLAs) and 270 km North-Northeast of the port city of Beira.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
Figure 13: Map of the location of MRG’s new granted Olinga 11005L Uranium and Rare Earth Exploration
licence (EL); and the recently granted Adriano 11002L REE Exploration licences (ELAs, 11000L and) in
relation to MRG’s exiting Heavy Mineral Sands exploration licences and the port city of Beira.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
The Olinga 11005L exploration licence was generated based on highly elevated U signature from regional
aerial geophysical survey work, in comparison to elevated Th with recently granted Adriano 11002L REE
Licence and an additional applied for REE Exploration licence application (Fotinho ELA 11000L, granting
eminent).
Figure 14: Map showing MRG’s Olinga Uranium and Rare Earth Exploration Licence (EL; 11005 L)
plotted on airborne radiometric spectrometer data of a regional national airborne geophysical survey.
ZIMBABWE
SHAWA CARBONATITE COMPLEX
High Grade Results for Phosphate, Strontium and Iron From Portable Xrf
During the quarter, MRG announced the completion of Phase 2 exploration at Shawa Carbonatite Mining
Licenses in Zimbabwe and the results of all the collected outcrop, subcrop (from a pitting program) and
soil samples.
After the completion of the geological mapping and initial outcrop sampling at Shawa, Phase 2 of
ground exploration on the ten (10) Wickbury Mining Licences on the Shawa Carbonatite Complex has
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
been completed, with a total of 376 outcrop and subcrop samples (from a shallow pitting program of
<1m vertical depth) and 670 soil samples collected.
Outcrop and subcrop samples were analysed on site with a Vanta REE pXRF (results not being
reported in lieu of more accurate pulp analysed results reported here). The samples were pulverised
at the accredited Performance preparatory facility in Harare, Zimbabwe. The pulp samples were then
analysed with the same Vanta REE pXRF, and all sieved soil samples were analysed similarly. Each
pulp and sieved soil sample was analysed by the Vanta REE pXRF three (3) times, with the pXRF
supplying an average for every 3 analyses for all elements.
MRG added QC (Quality Control) samples to the pXRF analyses, with 1 African Mineral Standards
(AMIS) Blank and 3 AMIS reference Standards added after every 20 samples. Analyses were
completed on the QC samples to determine accuracy of the analyses, with the calculated correction
factor determined for all elements, with the unedited results reported.
Figure 15: Shawa Carbonatite in relation to Harare and the Mozambican Beira Port shown on Google
Earth image, yellow roads national tar roads. Insert of Shawa and adjacent Dorowa carbonatites.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
Figure 16: Outcrop (yellow), subcrop (white) and soil (black dots) sampling positions from Phase 2
within the 10 Wickbury Mining Claims.
pXRF results Phosphorus (P)
The pXRF results indicate high grade P results from outcrop / subcrop samples in the west of the
Wickbury claims (refer Figure 17). 17 samples with >10,000 ppm, equivalent to >2.29% P₂O₅
(conversion factor of 2.29 for P to P₂O₅) are reported (refer Figure 3a); with results as high as 48,405
ppm (4.84% P, 11.08% P₂O₅). Soil results show 21 samples with >5,000 ppm / 0.5% P, equivalent to
1.15% P₂O₅ (refer Figure 17b); with results as high as 12,598 ppm / 1.26% P / 2.89% P₂O₅. These
highly anomalous P results from outcrop define a clear target area, 1,500 m X 700 m in the west of
the Wickbury claims (refer Figure 17). This area will be explored via trenching in the next phase of
exploration, followed up by shallow (c 50m depth) RC drilling if the trenching shows mineralisation
continuity.
The highly anomalous pXRF results from soils, particularly towards the east of the outcrop target and
adjacent to the SAMREC inner ring P₂O₅ resource, has defined a second P target. This will be further
explored via trenching.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
Figure 17: a) Phosphorus (P) pXRF results from outcrop and subcrop samples; b) Phosphorus
(P) pXRF results from soil samples in the Wickbury claims. Outcrop and soil targets shown as
red highlighted areas in the images.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
pXRF results Iron (Fe)
The pXRF results show highly anomalous Fe results from magnetite outcrop / subcrop samples, with
6 samples showing pXRF results of >600,000 ppm / 60% Fe (refer Figure 4a). In the soils, 38 samples
were found with >200,000 ppm / 20% Fe (refer Figure 4b). Analyses of the magnetite samples will
supply definitive information of the Ti content of the magnetite. The significant magnetite outcrop
identified within the Wickbury licences will be further evaluated by detailed sampling and trenching.
pXRF results Strontium (Sr)
In the pXRF results, very high grade Sr results can be seen from outcrop / subcrop samples, with 3
samples showing pXRF results of >130,000 ppm / 13% Sr (refer Figure 5a). In the soils, 8 samples were
found with >110,000 ppm / 11% (refer Figure 5b).
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
Figure 18: a) Iron (Fe) pXRF results from outcrop and subcrop samples;
b) Iron (Fe) pXRF results from soil samples in the Wickbury claims.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
Figure 19: a) Strontium (Sr) pXRF results from outcrop and subcrop samples;
b) Strontium (Sr) pXRF results from soil samples in the Wickbury claims.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
Other anomalous pXRF results
•
•
•
•
Barium (Ba) results show high Ba from outcrop / subcrop samples, with 3 samples showing
pXRF results of >130,000 ppm / 13% Ba. In the soils, 8 samples were found with >110,000
ppm / 11% Ba.
Niobium (Nb) results show elevated Nb from outcrop / subcrop samples, with 5 samples
showing pXRF results of >100 ppm Nb. In the soils, 53 samples were found with >100 ppm
Nb, with values as high as 963 ppm.
Nickel (Ni) results show elevated Ni from outcrop / subcrop samples, pXRF results as high as
2,374 ppm Ni. In the soils elevated Ni results as high as 3,761 ppm was found.
Lead (Pb) results show elevated Pb from outcrop / subcrop samples, pXRF results as high as
1,761 ppm Pb. In the soils elevated Pb results as high as 641 ppm was found.
Anomalous REE values:
•
•
•
Yttrium (Y) results show elevated Y from outcrop / subcrop samples, pXRF results as high as
1,443 ppm Y.
Praseodymium (Pr) results show elevated Pr from outcrop / subcrop samples, pXRF results
as high as 1,706 ppm Pr. In the soils elevated Pr results as high as 498 ppm was found.
Neodymium (Nd) results show elevated Nb from outcrop / subcrop samples, pXRF results as
high as 2,952 ppm Nb. In the soils elevated Nb results as high as 779 ppm was found.
As stated above, all 10 of the Wickbury Mining Licences have now been mapped and first-pass rock and
soil sampled. Exploration is specifically focussed on the discovery of REE, Nb, Sr, Phosphate, Magnesite
and Magnetite mineralisation, with exploration also geared towards identifying additional
mineralisation.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
Figure 20: Images of exploration activities at Shawa. a) mapping taking place; b) pitting program to
sample sub-crop during mapping; c) hand-held XRF analyses during field sampling and mapping; and d)
hand-held XRF analyses at the sample handling facility of all rock and soil samples, with the rock
samples to be analyses again by hand-held XRF after sample preparation (pulp samples).
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
www.mrgmetals.com.au / info@mrgmetals.com.au
AUSTRALIA
WESTERN AUSTRALIA LITHIUM EXPLORATION
MRG has generated promising pXRF anomalism from first pass soil sampling at the Lake Johnston and
Forrestania projects in Western Australia. In both projects, there was no outcrop identified during field
operations and the pXRF results are interpreted to be looking through a shallow layer of un-mineralised
surface cover at a bedrock signature below.
MRG has decided not to spend money on assays to confirm low levels of lithium anomalism in the cover
sequence. The Company will instead prioritise the highe