MRG Confirms Simple Processing Pathway at High-Grade Garies Project
Metallurgical testwork on high-grade mineralisation from the DrillTarg deposit at the Garies
Rare Earth Project has confirmed a simple and scalable processing pathway to produce a
saleable monazite concentrate, with initial recovery of ~72% and a pathway to >80%.
Highlights:
• Initial metallurgical testwork on composite samples of DrillTarg rare earth
mineralisation confirms a simple processing pathway.
• Testwork undertaken on a ~350kg composite sample supports development of a
scalable flowsheet using conventional equipment.
• Monazite concentrate produced with initial recovery of ~72%, with a pathway to >80%
through further optimisation.
• Recovered monazite contains approximately 60% rare earth oxides (REO), including a
valuable magnet and heavy rare earth component.
• Magnet rare earths NdPr comprise >24% of TREO in the monazite, with heavy rare
earths (including Tb, Dy and Y) contributing a further ~9%.
• Testwork demonstrates a simple, predominantly physical processing route, with
flotation as the final stage.
• Results from the 2025 RC drilling campaign, from which the metallurgical composite
sample was derived, include high-grade intersections:
o 6.6m @ 4.49% TREO
o 5.45m @ 3.39% TREO
o 6.0m @ 3.35% TREO
o 5.8m @ 3.34% TREO
o 4.75m @ 3.01% TREO
• DrillTarg is the first of 23 identified rare earth targets across MRG’s 275km² Garies
tenement, with most targets yet to be drill tested.
• A Maiden Mineral Resource Estimate is in progress, and a Mining Right Application for
the Garies Project is in preparation.
• Supports potential for a low-cost, scalable processing solution for the Garies Project.
MRG Metals Limited (ASX: MRQ) (“MRG” or “the Company”) is pleased to provide an update on
metallurgical testwork for the DrillTarg deposit at its Garies Rare Earth Project in South Africa.
Testwork was conducted by Light Deep Earth (LDE) Laboratories, Pretoria, on approximately
350kg of representative drill sample material derived from mineralised intersections of the
2025 RC drilling program.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353 www.mrgmetals.com.au / info@mrgmetals.com.au
ASX Announcement
2 April 2026
Results confirm that DrillTarg mineralisation responds well to a simple processing pathway,
producing a monazite concentrate suitable for sale to rare earth processors.
The proposed flowsheet builds on earlier work demonstrating that monazite can be
recovered using conventional:
• Magnetic separation
• Gravity concentration
• Flotation
Exploration to date at the Garies Project has demonstrated exceptionally high-grade rare
earth mineralisation, with a valuable mix of magnet and heavy rare earths, as well as high-
grade iron and gallium, and is considered amenable to shallow open-pit mining with a low
strip ratio.
MRG Chairman, Andrew van der Zwan, commented:
“This initial metallurgical testwork is an important step in confirming a simple and scalable
processing pathway for the Garies Project. The ability to produce a high-grade monazite
concentrate using predominantly physical processing methods supports the potential for a
low-cost development.”
“Importantly, the results demonstrate strong recoveries from high-grade DrillTarg
mineralisation, with a clear pathway to further optimisation. With a large pipeline of
additional targets across the Garies tenement, we see significant opportunity to build scale
and value in the project.”
Next Steps
MRG will continue advancing the Garies Rare Earth Project through the following work
programs during 2026:
• A small Maiden Mineral Resource Estimate (<100,000 tonnes) for the DrillTarg
deposit, expected to be reported in Q2 CY26.
• Further metallurgical testwork, targeting improved monazite recoveries and
optimisation of the proposed processing flowsheet.
• Preparation and submission of a Mining Right Application (mining licence) for the
Garies Project.
• Expansion of geophysical surveys, including aerial magnetic and radiometric surveys
across the whole 275 km² Garies tenement to refine drill targets.
• Drill testing of additional targets, with DrillTarg representing the first of 23 identified
rare earth prospects within an 85km² area of the broader 275km² Garies tenement.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353 www.mrgmetals.com.au / info@mrgmetals.com.au
ASX Announcement
2 April 2026
Process Flowsheet and Metallurgical Testwork
Metallurgical testwork was undertaken by LDE on a ~350kg bulk composite sample from the
DrillTarg deposit.
The program builds on earlier work demonstrating that monazite can be recovered using
magnetic separation.
The key objectives of the 2025 testwork were to:
• Improve liberation of coarse monazite through phased milling
• Evaluate flotation for recovery of fine monazite
Both objectives were achieved, confirming the effectiveness of a combined physical
separation and flotation processing pathway.
Process Flowsheet and Results
The process flowsheet developed during testwork incorporates staged milling, physical
separation and flotation, with flotation used to enhance recovery of fine monazite.
Testwork delivered an overall monazite recovery of approximately 72%, producing a
combined monazite concentrate grading approximately 51% monazite.
The process flowsheet and summary results from LDE’s testing of the DrillTarg bulk
composite sample are shown in the diagram below – see figure 1.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353 www.mrgmetals.com.au / info@mrgmetals.com.au
ASX Announcement
2 April 2026
Figure 1. Summary process flowsheet for 2025 bulk sample from drillholes.
The individual process streams contributing to the final product, including coarse and fine
monazite-rich concentrates, are summarised in Table 1.
Table 1 - 2025 Metallurgical Testwork Results – Monazite Concentrate Streams
and Recovery
Stream
Weight
(%)
REO
Distribution
(% of Feed)
Cumulative
REO Recovery
(%)
Monazite
Grade (%)
Cumulative
Monazite Grade
(%)
Bulk Sample Feed 100.00 100.0 – 6.7 –
Coarse non-mag
shaker table
concentrate
3.33 36.4 36.4 74 74
Coarse non-mag
shaker table
middlings
0.73 4.7 41.1 43 68
Fines non-mag
flotation
concentrate 3
2.87 19.4 60.5 43 58
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353 www.mrgmetals.com.au / info@mrgmetals.com.au
ASX Announcement
2 April 2026
Stream
Weight
(%)
REO
Distribution
(% of Feed)
Cumulative
REO Recovery
(%)
Monazite
Grade (%)
Cumulative
Monazite Grade
(%)
Fines non-mag
flotation
concentrate 2
1.74 10.3 70.8 38 54
Fines non-mag
flotation
concentrate 1
0.72 1.4 72.2 12 51
Total Monazite-
Rich Product
9.39 – 72.2 – 51
Opportunities for Improvement
Testwork identified several opportunities to further improve both recovery and concentrate
quality through optimisation of the process flowsheet.
Potential improvements include:
• Further optimisation of flotation conditions to enhance recovery of fine monazite
• Refinement of milling and liberation to increase recovery from coarse fractions
• Improved upgrading of concentrate streams to increase overall monazite grade
Based on the results to date, monazite recoveries exceeding 80% are considered achievable,
with concentrate grades of approximately 60% monazite.
These opportunities will be evaluated in subsequent phases of metallurgical testwork.
Proposed Concept Mine Flowsheet
The proposed concept mine flowsheet for the Garies Project is based on conventional open-
pit mining and mineral processing methods designed to maximise recovery of monazite
while also producing an iron-rich magnetic stream.
Ore will be mined using standard drill and blast methods, followed by load-and-haul to the
processing plant. Run-of-mine material is crushed and screened to <2mm, then milled in a
rod mill to <0.2mm.
The milled material is classified into coarse and fine fractions. The coarse fraction (+50
micron to 0.2mm) is treated by magnetic separation, with the non-magnetic stream
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353 www.mrgmetals.com.au / info@mrgmetals.com.au
ASX Announcement
2 April 2026
processed by gravity separation to produce a monazite-rich concentrate. Magnetic material,
comprising magnetite and hematite, is directed to a tailings stockpile.
The fine fraction (<50 micron), containing approximately 35–40% of the feed monazite, is
also processed through magnetic separation, with the non-magnetic stream treated by
flotation to recover fine monazite.
The flowsheet supports a simple and scalable processing pathway using conventional
equipment and reflects LDE testwork, which demonstrated that flotation of the fine fraction
materially improves overall recovery. The concept flowsheet is shown in Figure 2.
Figure 2. Summary concept mining and processing flowsheet
Building a High-Grade Critical Minerals Company Specialising in Rare Earths
The acquisition of the Garies Project in December 2025 completed MRG's transformation into
a diversified critical minerals company.
MRG now advances three projects in parallel across two jurisdictions:
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353 www.mrgmetals.com.au / info@mrgmetals.com.au
ASX Announcement
2 April 2026
• Garies Rare Earth Project (South Africa): High-grade, monazite-hosted rare earth
mineralisation with simple metallurgy and a low-capex development profile.
• Adriano-Fotinho Rare Earth Project (Mozambique): An emerging rare earth corridor
with district-scale exploration potential.
• Mozambique Titanium Dioxide Joint Venture: A ~2 billion tonne JORC-compliant
resource with a clear pathway to near-term production.
Each project is at a different stage of development, providing multiple concurrent value
drivers and reducing reliance on any single asset.
This announcement has been authorised for release by the MRG Metals Limited Board of
Directors.
For more information please contact:
MRG Metals Investor Relations
Andrew Van Der Zwan Angus Kennelly
Chairman Massive Intelligence
M: +61 (0) 400 982 987 E: angus@massiveintelligence.com.au
E: andrew@mrgmetals.com.au
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353 www.mrgmetals.com.au / info@mrgmetals.com.au
Section 1 Sampling Techniques and Data
Criteria Explanation Comment
Sampling techniques Nature and quality of
sampling (eg cut channels,
random chips, or specific
specialised industry
standard measurement
tools appropriate to the
minerals under
investigation, such as down
hole gamma sondes, or
handheld XRF instruments,
etc). These examples
should not be taken as
limiting the broad meaning
of sampling.
Include reference to
measures taken to ensure
sample representivity and
the appropriate calibration
of any measurement tools
or systems used.
Aspects of the
determination of
mineralisation that are
Material to the Public
Report. In cases where
‘industry standard’ work
has been done this would
be relatively simple (eg
‘reverse circulation drilling
was used to obtain 1 m
samples from which 3 kg
was pulverised to produce
a 30 g charge for fire
assay’). In other cases more
explanation may be
required, such as where
there is coarse gold that
has inherent sampling
problems. Unusual
commodities or
mineralisation types (eg
• Samples used to assess the DrillTarg resource
have been derived from reverse circulation (RC)
and surface sampling.
• Two drilling programmes have been completed
to date:
o In 2025, 42 drillholes totalling 1,309m
o In 2015, 14 drillholes totalling 335m
• Samples from each metre were collected from
the sample cyclone using pre-marked
“sausage/tube” style plastic bags, preserving
variations by depth within the one metre
drilling interval.
• Sub-samples by depth can be taken down to a
minimum of 30cm thickness.
• The one metres samples were geologically
logged, weighed radiation levels recorded.
• Rare earth oxide (REO) mineralisation at
DrillTarg is:
o easily detected in the field.
o hosted by black, coarse grained magnetite
veins, typically emplaced within pale,
silicified granite gneiss.
o associated with low levels of thorium,
easily detected with hand-held radiation
meters.
• Laboratory samples were planned using one
metre intervals or geological contacts.
• Sample “tubes” were laid horizontally and the
bags opened lengthwise. Laboratory samples
were extracted using a shovel and then riffle-
split to give a lab sample and a reference
sample (retained with the other original drill
samples).
• Blanks and reference standards were inserted
at a rate of approximately 1 in 20 lab samples.
• Lab samples were initially analysed using XRF at
Light Deep Earth in Pretoria. Samples with an
expected REO content exceeding 0.5% were
then submitted for full-suite ICP-MS analyses at
UIS.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353 www.mrgmetals.com.au / info@mrgmetals.com.au
Criteria Explanation Comment
submarine nodules) may
warrant disclosure of
detailed information.
Drilling techniques Drill type (eg core, reverse
circulation, open-hole
hammer, rotary air blast,
auger, Bangka, sonic, etc)
and details (eg core
diameter, triple or standard
tube, depth of diamond
tails, face-sampling bit or
other type, whether core is
oriented and if so, by what
method, etc).
• Reverse Circulation drilling at DrillTarg utilised
a nominal 133 mm (6”) diameter hammer bit
and a twin-tube system.
• Torque Drilling provided RC drilling services for
both the 2015 and 2025 programs using track-
mounted drilling rigs and air compressors.
Drill sample recovery Method of recording and
assessing core and chip
sample recoveries and
results assessed.
Measures taken to
maximise sample recovery
and ensure representative
nature of the samples.
Whether a relationship
exists between sample
recovery and grade and
whether sample bias may
have occurred due to
preferential loss/gain of
fine/coarse material.
• Recoveries are recorded by the geologist in the
field at the time of drilling and also recorded
with the sample weight.
• If poor sample recovery is encountered during
drilling, the geologist and driller have
endeavoured to rectify the problem to ensure
maximum sample recovery. Visual assessment
is made for moisture and contamination.
• Reduced recoveries are often observed in the
top few metres of drillholes with this style of
drilling as observed in drillholes at DrillTarg.
• Sample recoveries are generally high, and
moisture in samples minimal.
• Test-work shows that the REO-bearing
monazite grains are preferentially crushed to
fines when the whole sample is crushed. It is
therefore possible that some down-grading of
the REO grades has occurred due to
preferential REO loss in the cyclone dust in the
drilling and sampling process. To date, no
quantitative testing has been attempted, but
cyclone blow-over dust is a very minor portion
of the total sample, so the possible bias is likely
to be minimal.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353 www.mrgmetals.com.au / info@mrgmetals.com.au
Criteria Explanation Comment
Logging Whether core and chip
samples have been
geologically and
geotechnically logged to a
level of detail to support
appropriate Mineral
Resource estimation,
mining studies and
metallurgical studies.
Whether logging is
qualitative or quantitative
in nature. Core (or costean,
channel, etc) photography.
The total length and
percentage of the relevant
intersections logged.
• Logging samples were extracted during drilling
and left in regular piles at the drilling site.
(Example below: D25RC003 0-20m)
• After removal to a central sample processing
area, the main sample bags (tubes) were
photographed, open and closed (example
below D25RC003 5-10m).
• Radiation emitted from the samples was
recorded.
• Drill chips sieved from the main sample were
put into plastic trays and photographed wet and
dry (examples below D25RC003 0-20m)
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353 www.mrgmetals.com.au / info@mrgmetals.com.au
Criteria Explanation Comment
• Chip trays were logged and intersections
requiring analysis marked by the geologist.
• Logging is semi-quantitative.
Sub-sampling
techniques and
sample preparation
If core, whether cut or
sawn and whether quarter,
half or all core taken.
If non-core, whether riffled,
tube sampled, rotary split,
etc and whether sampled
wet or dry.
For all sample types, the
nature, quality and
appropriateness of the
sample preparation
technique.
Quality control procedures
adopted for all sub-
sampling stages to
maximise representivity of
samples.
Measures taken to ensure
that the sampling is
representative of the in situ
material collected,
including for instance
results for field
duplicate/second-half
sampling.
• Samples were riffle split to obtain
representative sub-samples.
• For full metre samples 4 passes through the
splitter were typically required to reduce the
sample to a suitable size for the laboratory (2-
3kg).
• Most samples were dry, but where samples
were moist, the splitter was cleaned between
samples.
• Laboratory samples averaged 2.5 kg, but some
dense, magnetite-rich samples exceeded 4kg.
• The sample size is considered appropriate and
representative for the grain size and style of
mineralisation.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353 www.mrgmetals.com.au / info@mrgmetals.com.au
Criteria Explanation Comment
Whether sample sizes are
appropriate to the grain
size of the material being
sampled.
Quality of assay
data and laboratory
tests
The nature, quality and
appropriateness of the
assaying and laboratory
procedures used and
whether the technique is
considered partial or total.
For geophysical tools,
spectrometers, handheld
XRF instruments, etc, the
parameters used in
determining the analysis
including instrument make
and model, reading times,
calibrations factors applied
and their derivation, etc.
Nature of quality control
procedures adopted (eg
standards, blanks,
duplicates, external
laboratory checks) and
whether acceptable levels
of accuracy (ie lack of bias)
and precision have been
established.
• Light Deep Earth (LDE, Pretoria) prepared the
samples for analysis and conducted initial XRF
analyses. The XRF suite collected by LDE
included the major REOs CeO2, La2O3, Nd2O3
and Pr6O11 which typically comprise about
85% of the total REOs present in the
mineralisation.
• Samples that exceeded approximately 0.4%
combined CeO2, La2O3, Nd2O3 & Pr6O11 were
then submitted to UIS laboratory for ICP-MS
analysis, including a full suite of REO (excluding
Pm).
• Certified reference material and blanks were
inserted at a rate of about 1 sample in 20.
• The laboratories conducted their own quality
control repeats at a rate of about 1 in 8.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353 www.mrgmetals.com.au / info@mrgmetals.com.au
Criteria Explanation Comment
Verification of
sampling and
assaying
The verification of
significant intersections by
either independent or
alternative company
personnel.
The use of twinned holes.
Documentation of primary
data, data entry
procedures, data
verification, data storage
(physical and electronic)
protocols.
Discuss any adjustment to
assay data.
• Significant intersections are identified in the
field by geology (magnetite-hosted), and
anomalous emitted radiation.
• In every case, laboratory results confirmed the
levels of mineralisation expected from the field
samples.
• At least two geologists confirmed the significant
intersections.
• Samples were logged and photographed in the
field.
• All geological logging and sampling information
is completed firstly on to paper logs before
being transferred to Microsoft Excel
spreadsheets.
• To date, no drillholes have been twinned, given
the early stage of development.
• Electronic copies of all information are backed
up routinely.
• No adjustments of assay data are necessary.
Location of data
points
Accuracy and quality of
surveys used to locate drill
holes (collar and down-hole
surveys), trenches, mine
workings and other
locations used in Mineral
Resource estimation.
Specification of the grid
system used.
Quality and adequacy of
topographic control.
• Drillhole collars completed during 2025 were
surveyed using RTK survey equipment.
• Accuracies of the drillhole collar locations are
+/- 0.01m (ie 1cm) horizontal and 0.03m
vertical.
• The grid system used is WGS84 / UTM (Zone
34S): EPSG 32734.
• Despite the difficult terrain, significant efforts
were made to correctly align the drilling rig to
the planned dips and azimuths.
• Down-hole surveys have not been completed
at DrillTarg due to:
o The strongly magnetic nature of the
magnetite mineralisation precludes the use
of magnetic compass down-hole survey
instruments.
o The alternative use of gyroscopic
instruments would require the installation
of drillhole casings, at much greater
expense and logistical difficulty.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353 www.mrgmetals.com.au / info@mrgmetals.com.au
Criteria Explanation Comment
o The relatively shallow drilling means that
downhole variations in dip and azimuth are
not significant.
Data spacing and
distribution
Data spacing for reporting
of Exploration Results.
Whether the data spacing
and distribution is sufficient
to establish the degree of
geological and grade
continuity appropriate for
the Mineral Resource and
Ore Reserve estimation
procedure(s) and
classifications applied.
Whether sample
compositing has been
applied.
• Drillholes were planned at 5m x 10m spacing at
DrillTarg, although the topography required
many holes to be positioned small distances
away from the planned locations.
• A cross-fault has caused a roughly horizontal
15m translation of the main mineralised body
but the mineralisation is similar on each side of
the fault.
• Sample compositing was not applied in the
resource estimation.
• Drillholes are sufficiently close that there is
little doubt regarding continuity between
mineralised zones on adjacent drillholes.
• Mineralisation close to the drillhole intercepts
is classed as “Indicated Resource” based on the
sample density and continuity.
• Interpreted zones further than about 10m from
the drillholes are classed as “Inferred”.
• The outcrop zone on the western side of the
DrillTarg resource is classed as “Inferred” based
on less systematic sampling (spot rock-chips
versus drill cuttings). Spot rock-chip samples
were taken from at least 6 ”typical” areas of
mineralisation across the 50 x 6m outcrop
(excluding high grade areas), to create a
composite sample of the outcrop zone.
Orientation of data
in relation to
geological structure
Whether the orientation of
sampling achieves
unbiased sampling of
possible structures and the
extent to which this is
known, considering the
deposit type.
If the relationship between
the drilling orientation and
the orientation of key
mineralised structures is
considered to have
introduced a sampling bias,
• Drilling shows that the mineralisation is
predominantly sub-vertical in the DrillTarg
area.
• Most drill holes were angled at 60 degrees to
horizontal and at approximate right angles to
the strike trend.
• The drilling direction is unlikely to have
introduced a sampling bias, although the
drilling intersections are generally thicker than
the mineralisation as the drilling cuts the veins
at an apparent angle.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353 www.mrgmetals.com.au / info@mrgmetals.com.au
Criteria Explanation Comment
this should be assessed and
reported if material.
Sample security The measures taken to
ensure sample security.
• Samples were taken from the drilling rig to a
nearby fenced-off compound for
photographing, logging and splitting.
• Laboratory samples stayed within the
compound until they were packed into poly-
weave sacks and delivered to the local freight
company.
• The sample numbers despatched and received
to the laboratory were checked prior to the lab
commencing work.
• The levels of radiation measured in the drill
samples was compared with the laboratory
results (REO%) and showed good correlation. If
samples had been “tampered with” between
the drilling rig and the laboratory,
discrepancies would be evident.
Audits or reviews The results of any audits or
reviews of sampling
techniques and data.
No review has taken place on data to date.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353 www.mrgmetals.com.au / info@mrgmetals.com.au
Section 2 Reporting of Exploration Results
Criteria Explanation Comment
Mineral tenement
and land tenure
status
Type, reference
name/number, location
and ownership including
agreements or material
issues with third parties
such as joint ventures,
partnerships, overriding
royalties, native title
interests, historical sites,
wilderness or national park
and environmental
settings.
The security of the tenure
held at the time of
reporting along with any
known impediments to
obtaining a licence to
operate in the area.
• Sampling has been undertaken on Prospecting
Right 10343 of the Northern Cape Province of
South Africa, held by Tundratype Pty Ltd, a
wholly owned subsidiary of Sheerartar Minerals
Pty Ltd.
• The tenure was in good standing at the time of
writing with no known impediments to further
development.
Exploration done by
other parties
Acknowledgment and
appraisal of exploration by
other parties.
• Tundratype conducted drilling and geophysics
at DrillTarg in 2013-2015. No other exploration
is known about at this prospect, although it is
possible that earlier regional radiometrics
surveys for uranium detected the thorium
anomaly at DrillTarg.
• It is possible that the mineralisation is
referenced in regional geology publications by
the South African Department of Mines,
although the location is different to that given
in the publications.
• Axiom Exploration Group Ltd conducted a
thorough review of previous work on the lease
area in 2024, including estimation of
exploration targets. A site visit was conducted
and various targets sampled.
Geology Deposit type, geological
setting and style of
mineralisation.
• Deposit Type: Despite lacking apatite, the REE
mineralisation is probably best classified as a
variety of iron-oxide – apatite deposit (IOA
deposits). REE are commonly associated with
the phosphorus in IOA deposits, typically
present within apatite, but also commonly
within monazite.
• Geological Setting: The tenement is situated in
southern Namaqualand, along the
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ Phone: +61 3 5330 5800 / Fax: +61 3 5330 5890
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353 www.mrgmetals.com.au / info@mrgmetals.com.au
Criteria Explanation Comment
mountainous escarpment separating the inland
Bushmanland plateau from the sandy West
Coast plains. The region is host to a variety of
igneous, sedimentary and metamorphic rock
types, with ages ranging from Mesoproterozoic
to Recent. The Garies mineralisation is hosted
within the Kamiesberg Group, a complex
variety of gneiss types of uncertain origin,
although probably with some meta-sediments
and granitic precursors. The gneisses have been
subjected to upper granulite facies
metamorphism with significant levels of partial
melting.
• Style of Mineralisation: REE mineralisation
within the Garies tenement area is hosted by
structurally controlled magnetite veins/dikes.
The magnetite veins contain monazite (hosting
the REE) and minor amounts of accessory
minerals (sericite, rutile, zircon). The magnetite
is generally coarse grained and has sharp
boundaries with the country rocks, although
some ferruginous staining of the surrounding
country rocks is visible in places, possibly due
to secondary remobilisation of iron.
Drill hole
Information
A summary of all
information material to the
understanding of the
exploration results
including a tabulation of
the following information
for all Material drill holes:
- easting and northing of
the drill hole collar
- elevation or RL
(Reduced Level –
elevation above sea
level in metres) of the
drill hole collar
- dip and azimuth of the
Share your feedback
Discover