Quarterly Activities & Cashflow Report
Released
Released
Announcement PDF
30 APRIL 2015 ASX ANNOUNCEMENT
QUARTERLY REPORT
FOR THE PERIOD ENDING 31 MARCH 2015
• DRILLING AT LOONGANA SET TO COMMENCE
• DRILLING AT XANADU SET TO COMMENCE
• NEW IOCG PROJECTS ACQUIRED IN QUEENSLAND
• RESEARCH & DEVELOPMENT GRANT RECEIVED
• EXTENSION OF AGREEMENT WITH SASAK TECHNOLOGY
LOONGANA PROJECT
The Loongana Project is located east of Kalgoorlie, near the Trans Australia railway line. MRG holds two tenements
that cover the majority of the Loongana Igneous Complex (Figure 1) and the remainder of this Complex is held by
Fortescue Metals Ltd. This Complex is a large layered mafic and ultramafic intrusive body that lies at depths ranging
from 250 metres to 350 metres below the surface. It includes one of the strongest gravity residuals in Australia, with
accompanying diverse magnetic features.
MRG proposes to drill two holes (Reverse Circulation followed by diamond tails) into PGE (Platinum Group Element)
reef style target at Loongana.
During late 2014 the original drill core and RC chips generated by previous drilling were re-logged and the anomalous
interval in hole LNDG001 was re assayed. This work confirmed the original deposit model of a stratiform reef-style
PGE deposit, similar to those currently mined in South Africa (Bushveld/Stillwater type).
The magnetic image in Figure 2 shows the potential reef position across the southern part of the intrusion, which is
separated into 4 segments by later faults. In total there is an interpreted 11.45 km of strike of the reef structure. The
exploration target, assuming the full strike length of 11.45km is mineralised, a 2m true width, a grade around 4 g/t Pt
+ Pd + Au + Rh and a down dip length of 1000m is a potential contained PGE plus Au endowment of nearly 9M oz.
This initial two drilling program is designed as a ‘proof of concept’ and if successful a follow up drill program will be
undertaken.
Drilling is pending approval of the Program of Works which is expected to be soon granted.
Costs up to $108,000 – 50% of the drilling cost – will be covered by the West Australia Government’s Exploration
Incentive Scheme.
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
Phone: +61 3 5330 5800 / Fax: +61 3 5333 1667
www.mrgmetals.com.au / info@mrgmetals.com.au
MARCH 2015 Quarterly Report
Kalgoorlie • LOONGANA
PERTH•
30° 30.60’S
30° 40.98’S
0
10km
126° 2064’E
126° 32.85’E
126° 45.05’E
LOONGANA PROJECT
Loongana Complex - Tenements over TMI + Gravity
MRG METALS LTD. MARCH 2015. Map Grid of Australia GDA 94 ZONE 52 J
Figure 1. Loongana Complex - Tenements over TMI + Gravity.
2
MRG Tenements
FMG Tenements
MARCH 2015 Quarterly Report
Figure 2. Loongana Project
XANADU PROJECT
MRG’s Xanadu project is located close to the northern margin of the Ashburton Basin, some 4 kilometres WSW of
Northern Star Resources Ltd’s Ashburton Project (21.3 million tonnes @ 2.4g/t gold for 1.67 million ounces). The
Xanadu mineralisation was discovered in the mid 1980’s by BP Minerals and has been subject to various phases of
exploration in the ensuing period until MRG’s acquisition.
Concurrent with MRG’s first drill program undertaken during May 2014 (15 holes for 1,677 metres, see June 2014
Quarterly Report) a soil sampling program outlined a new prospect area now called Pertinax. This prospect lies close
to the north-eastern boundary of the tenement, where the Cheela Springs Basalt abuts the overlying sediments of
the Mount McGrath Formation. This geological position is akin to those found on Northern Star Resources Ltd’s
adjacent Ashburton Project. The drilling program will comprise two components: 8 holes testing for Mount Olympus
style mineralisation at the base of the Cheela Springs Basalt (Pertinax & Asterix Prospects) and up to four holes to test
shallow open pitable resources potential to the NE of the Cleopatra Prospect.
The drilling that was planned to commence during the quarter was delayed by wet weather associated with Tropical
Cyclone Olwyn and is now planned for Q2 2015.
QUEENSLAND IRON OXIDE COPPER GOLD PROJECTS
Shortly after the end of the quarter, MRG’s IOCG ground holding in the Mt Isa province in Queensland was increased,
with the acquisition of 4 exploration tenement applications from Sasak Minerals Pty Ltd – Kamileroi, Oban, Mt Angelay
and Selwyn (Figure 3).
3
MARCH 2015 Quarterly Report
• Mount Isa
SQUIRREL HILL
• Longreach
PULCHERA
DAVENPORT DOWNS
BRISBANE•
0
QUEENSLAND IOCG PROJECTS
Tenements Over Bouguer Gravity
MRG METALS LTD.APRIL 2015. Map Grid of Australia GDA 94 ZONE 54 K
Figure 3.
4
MRG new application
MRG existing licences
Mine
25
50
100km
MARCH 2015 Quarterly Report
These were obtained via the Project Generation Agreement between MRG & Sasak Minerals Pty Ltd and were
selected using Sasak’s in-house predictive analytical targeting techniques for Iron Oxide Copper Gold (IOCG) deposits.
They cover high potential targets on open ground, within the prospective Mount Isa Block and lie under shallow cover,
close to favourable structural positions near existing mines. They complement MRG’s existing IOCG tenements in the
region, which now total seven projects.
Apart from the reimbursement of costs, these applications were acquired for nil consideration and demonstrate the
value of the ongoing relationship between MRG and Sasak, developed over the past 2 years, in delivering quality
exploration targets to the Company.
YARDILLA
MRG’s combined Yardilla project straddles part of the Cundeelee Fault, which separates the Archean Yilgarn Craton
from the Proterozoic Albany-Fraser Orogen and comprises three adjoining exploration licences. At regional scale the
project is situated in a similar tectonic setting as Tropicana (>8Moz Au ). It is considered to be prospective for gold,
nickel and base metals.
MRG has an option and purchase agreement over two granted exploration licences that adjoin an existing MRG 100%
owned licence. Together, they cover a contiguous area of approximately 220 square kilometres.
A program of calcrete sampling will commence in the coming quarter to aid in defining drill targets.
CORPORATE
Research & Development Claim Received
Just after the end of the quarter MRG received a cash payment pursuant to the Australian Government’s Research
and Development (“R&D”) Tax Incentive Scheme. The Company included a claim for R&D of $1,363,052 in its
2013/2014 income tax return resulting in a refundable tax offset of $613,373.
The Company appreciates the Government’s continued support for the R&D Tax Incentive, which provides valuable
financial assistance to MRG, who undertakes innovative and technically challenging mineral exploration research.
The refund will be used to fund the Company’s 2015 exploration programs.
EXTENDED RELATIONSHIP WITH SASAK TECHNOLOGY
On 1 April 2015 MRG Metals Ltd (MRG) announced the extension of the Technical Services Agreement and a new
Project Generation Agreement for a further term of 2 ½ years.
Commensurate with the strong relationship developed over the previous 2 years between the two Companies and
the joint belief in the projects within MRGs portfolio it was agreed that no upfront payments were necessary to reach
agreement. Sasak remains committed to driving success of the exploration portfolio and will continue to provide the
technology to do so.
MRG looks forward to the continuing relationship and future exploration success.
Keith Weston
Managing Director
The information in this summary report, as it relates to Exploration Results is based on information compiled and/or reviewed by Mr Keith Weston, who is a member of
the Australasian Institute of Mining and Metallurgy (AusIMM).
Mr Weston is an employee to the Company and has the relevant experience with the mineralisation reported on to qualify as a Competent Person as defined in the 2012
Edition of the “ Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves “. Mr Weston consents to the inclusion in the report of the
matters based on the information in the form and context in which they appear.
5
MARCH 2015 Quarterly Report
Appendix 5B
Mining exploration entity quarterly report
Rule 5.3
Appendix 5B
Mining exploration entity quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10
Name of entity
MRG METALS LIMITED
ABN
Quarter ended (“current quarter”)
83 148 938 532
31 March 2015
Consolidated statement of cash flows
Cash flows related to operating activities
1.1
Receipts from product sales and related
debtors
1.2
Payments for (a) exploration & evaluation
(b) development
(c) production
(d) administration
Dividends received
Interest and other items of a similar nature
received
Interest and other costs of finance paid
Income taxes paid
Other – Govt Drilling Grant
1.3
1.4
1.5
1.6
1.7
Net Operating Cash Flows
1.8
1.9
1.10
1.11
1.12
1.13
Cash flows related to investing activities
Payment for purchases of: (a) prospects
(b) equity investments
(c) other fixed assets
Proceeds from sale of:
(a) prospects
(b) equity investments
(c) other fixed assets
Loans to other entities
Loans repaid by other entities
Other (provide details if material)
Net investing cash flows
Total operating and investing cash flows
(carried forward)
+ See chapter 19 for defined terms.
6
17/12/2010 Appendix 5B Page 1
Current quarter
$A’000
Year to date
(9 Months)
$A’000
(84)
(592)
(143)
(592)
4
16
90
90
(133)
(1,078)
-
(9)
-
(9)
(133)
(1,087)
MARCH 2015 Quarterly Report
Appendix 5B
Mining exploration entity quarterly report
1.13
Total operating and investing cash flows
(brought forward)
(133)
(1,087)
0
0
Net increase (decrease) in cash held
(133)
(1,087)
1.20
1.21
Cash at beginning of quarter/year to date
Exchange rate adjustments to item 1.20
285
1,239
1.22
Cash at end of quarter
152
152
1.14
1.15
1.16
1.17
1.18
1.19
Cash flows related to financing activities
Proceeds from issues of shares, options, etc.
Proceeds from sale of forfeited shares
Proceeds from borrowings
Repayment of borrowings
Dividends paid
Other (provide details if material)
Net financing cash flows
Payments to directors of the entity and associates of the directors
Payments to related entities of the entity and associates of the
related entities
Current quarter
$A'000
1.23
Aggregate amount of payments to the parties included in item 1.2
1.24
Aggregate amount of loans to the parties included in item 1.10
1.25
Explanation necessary for an understanding of the transactions
Director Fees, Secretarial Fees, Consulting Fees, & Accounting Fees
$106
NIL
Non-cash financing and investing activities
2.1
Details of financing and investing transactions which have had a material effect on
consolidated assets and liabilities but did not involve cash flows
NIL
2.2
Details of outlays made by other entities to establish or increase their share in projects in
which the reporting entity has an interest
NIL
+ See chapter 19 for defined terms.
7
Appendix 5B Page 2
17/12/2010
MARCH 2015 Quarterly Report
Appendix 5B
Mining exploration entity quarterly report
Financing facilities available
Add notes as necessary for an understanding of the position.
3.1
Loan facilities
3.2
Credit standby arrangements
Amount available
$A’000
NIL
Amount used
$A’000
NIL
Estimated cash outflows for next quarter
$A’000
100
4.1
Exploration and evaluation
4.2
Development
NIL
4.3
Production
NIL
4.4
Administration
100
200
Total
Reconciliation of cash
Reconciliation of cash at the end of the quarter (as
shown in the consolidated statement of cash flows)
to the related items in the accounts is as follows.
5.1
Cash on hand and at bank
5.2
Deposits at call
5.3
Bank overdraft
5.4
Other (provide details)
Total: cash at end of quarter (item 1.22)
+ See chapter 19 for defined terms.
8
17/12/2010 Appendix 5B Page 3
Current quarter
$A’000
Previous quarter
$A’000
68
13
84
272
NIL
NIL
NIL
NIL
152
285
MARCH 2015 Quarterly Report
Appendix 5B
Mining exploration entity quarterly report
Changes in interests in mining tenements
Tenement
reference
Nature of interest
(note (2))
Interest at
beginning
of quarter
Interest at
end of
quarter
6.1
Interests in mining
tenements relinquished,
reduced or lapsed
East Exploration
Yilgarn
E38/2557
100%
0%
6.2
Interests in mining
tenements acquired or
increased
Loongana Exploration
E69/3288
0%
100%
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
7.1
7.2
7.3
7.4
7.5
Total number
Number quoted
NIL
NIL
135,612,115
135,612,115
NIL
NIL
NIL
NIL
Preference
+securities
(description)
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns
of capital, buybacks,
redemptions
+Ordinary
securities
Changes during
quarter
(a) Increases
through issue
(b) Decreases
+Convertible
debt
securities
(description)
Issue price per
security (see
note 3) (cents)
20 cents
Amount paid up
per security (see
note 3) (cents)
20 cents
+ See chapter 19 for defined terms.
9 Appendix 5B Page 4
17/12/2010
MARCH 2015 Quarterly Report
Appendix 5B
Mining exploration entity quarterly report
7.6
7.7
7.8
7.9
7.10
7.11
7.12
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through
securities
matured,
converted
Options
(description and
conversion
factor)
Issued during
quarter
Exercised
during quarter
Expired during
quarter
Debentures
(totals only)
Unsecured
notes (totals
only)
44,007,993
44,007,993
NIL
NIL
NIL
NIL
Exercise price
Expiry date
25 cents
21/09/2016
Compliance statement
1
This statement has been prepared under accounting policies which comply with
accounting standards as defined in the Corporations Act or other standards
acceptable to ASX (see note 5).
2
This statement does give a true and fair view of the matters disclosed.
Sign here:
Print name:
(Director/Company secretary)
SHANE TURNER
+ See chapter 19 for defined terms.
17/12/2010 Appendix 5B Page 5
10
Date: 30 April 2015
MARCH 2015 Quarterly Report
Appendix 5B
Mining exploration entity quarterly report
Notes
1
The quarterly report provides a basis for informing the market how the entity’s
activities have been financed for the past quarter and the effect on its cash
position. An entity wanting to disclose additional information is encouraged to
do so, in a note or notes attached to this report.
2
The “Nature of interest” (items 6.1 and 6.2) includes options in respect of
interests in mining tenements acquired, exercised or lapsed during the
reporting period. If the entity is involved in a joint venture agreement and
there are conditions precedent which will change its percentage interest in a
mining tenement, it should disclose the change of percentage interest and
conditions precedent in the list required for items 6.1 and 6.2.
3
Issued and quoted securities The issue price and amount paid up is not
required in items 7.1 and 7.3 for fully paid securities.
4
The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of
Mineral Resources and AASB 107: Statement of Cash Flows apply to this report.
5
Accounting Standards ASX will accept, for example, the use of International
Financial Reporting Standards for foreign entities. If the standards used do not
address a topic, the Australian standard on that topic (if any) must be complied
with.
== == == == ==
+ See chapter 19 for defined terms.
11
Appendix 5B Page 6
17/12/2010
Share your feedback
Discover