6 AUGUST 2015 ASX ANNOUNCEMENT
XANADU DRILLING UPDATE
• Shallow gold intercepts at Cleopatra building the potential for an open pitable gold resource
• New mineralised zone discovered at Pertinax
• Early results from RC drilling at Cleopatra confirms potential for a series of shallow, open pit
developments, including:
4m @ 3.44 g/t Au from 33m in X5009
5m @ 1.70 g/t Au from 50m in X5012
• Multi-element geochemical results from RC drilling at Pertinax confirm a new mineralised zone
with geochemical signatures akin to the adjacent +1Moz Mt Olympus deposit (Northern Star)
MRG Metals Ltd (‘MRG’) is pleased to announce preliminary results from recent RC drilling at Xanadu project in the
Ashburton Basin, located approximately 4km west southwest of Northern Star’s Mt Olympus deposit. Drilling was
focused on two gold targets; Cleopatra and Pertinax.
Cleopatra drilling tested a north east extension of the prospect to build on previous shallow gold intersections, in order
to identify open pitable Au resource potential. Whilst it was a small program, the drilling undertaken and the results
received have supported this goal.
Initial assay results from Pertinax confirm the existence of a mineralised zone with multi-element geochemical
signatures akin to the nearby +1Moz Mt Olympus deposit (Northern Star), revealing anomalous gold and associated
pathfinder geochemistry.
Further sampling is underway at both prospects, based on anomalous composite samples. Significant results to date
are tabulated in Appendix 1
Managing Director Keith Weston said: “The preliminary results from drilling campaigns at Cleopatra and Pertinax
gold targets confirm the prospectivity of the Xanadu project. This is an important initial step in MRG’s strategic goal
of developing economic open pitable gold deposits at Xanadu. Our priority is to complete further sampling at both
prospects to develop our understanding of the gold endowment over the project area.”
MRG Metals Limited ABN: 83 148 938 532 / ASX Code: MRQ
12 Anderson Street West, Ballarat VIC 3350 / PO Box 237 Ballarat VIC 3353
Phone: +61 3 5330 5800 / Fax: +61 3 5333 1667
www.mrgmetals.com.au / info@mrgmetals.com.au
6 august 2015 ASX ANNOUNCEMENT
XANADU DRILLING PROGRAM OVERVIEW
The second round of reverse circulation drilling has recently finished at MRG’s Xanadu project, with initial assay results
now received from the laboratory. These results are from the follow up holes completed at the Cleopatra prospect and
the first drill holes over the eastern and western ends of the Pertinax prospect (Figure 1).
580000mE
585000mE
590000mE
Pertinax Drilling
XANADU
Cleopatra Drilling
•Newman
PERTH
7405000mN
XANADU GOLD PROJECT
TENEMENTS OVER SATELITE IMAGE
MRG METALS LTD. August 2015. Map Grid of Australia GDA 94 ZONE 50 K
MRG Tenement
Top of dolomite
MRG Drilling
Anticlinal crest
Soil Sampling
Figure 1. Xanadu tenement outline, recent drilling and soil sampling.
CLEOPATRA – PRELIMINARY RESULTS
The recently completed drill holes on the northern part of the Cleopatra prospect were designed to test the north
western extent of the prospect area and uncover additional shallow gold mineralisation on the flank major anticlinal fold
axis. Previous drilling at Cleopatra in mid-2014 returned wide mineralised intercepts including 23m @ 1.14 g/t Au from
21m down hole in X4017 & 41m @ 0.44g/t Au from 20m down hole in X4018 (see ASX announcement 22 July 2014).
The additional holes drilled in this campaign demonstrated the presence of similar structural and lithological traps for
mineralising fluids, where a shallow dipping horizon of calcareous sediments hosts disseminated gold above a massive
dolomite unit.
Drilling on 40m centres has confirmed this general model, with mineralisation gradually getting deeper towards the
northeast and shallower to the south. The western line (holes X5010 through X5012) indicates that later north-south
faulting has caused the massive dolomite floor to be downthrown, however mineralisation is still present at exploitable
depths. The mineralisation is not yet bounded and follow-up extension and infill drilling is required in order to establish
a JORC resource.
Figure 2 on the following page illustrates how mineralisation (yellow to blue) lies immediately above the massive
dolomite unit (blue green).
2
6 august 2015 ASX ANNOUNCEMENT
X4015
11m@1.29g/t Au
X4017
23m@1.14g/t Au
X5012
18m@0.80g/t Au
inc. 5m@1.70g/t Au
X5011
5m@0.19g/t Au
X5010
5m@0.86g/t Au
X5009
20m@0.74g/t Au
inc. 4m@3.44g/t Au
X5008
7m@0.30g/t Au
X5007
12m@0.11g/t Au
X5006
5m@0.59g/t Au
X5013
5m@0.17g/t Au
X4018
41m@0.44g/t Au
XANADU PROJECT
Cleopatra Prospect – Current DH collars
MRG Metals Ltd August 2015. Map Grid of Australia GDA 94 Zone 50
e MRG Drillholes
e Historic Drillholes
Figure 2. 3D Perspective view of Cleopatra Prospect, Xanadu Gold Project, looking to the northwest, clearly illustrates the massive dolomite unit (as blue volume) with
intense arsenic alteration zone (dark blue - low, green - moderate & red - intense) extending southeast from the core of the prospect. This zone may represent where
mineralising fluids have been transported from deeper parts of the system thus indicative of mineralisation at depth.
PERTINAX – PRELIMINARY RESULTS
Drilling at the Pertinax prospect was directed to testing multi-element soil anomalies outlined by sampling of an area
with similar geological settings to the +1Moz Mt Olympus mine to the east. Four orientation lines were drilled at the
eastern and western ends of this 1.2km long zone (Figure 3).
XANADU
PERTH•
0
400m
X5016
X5014
X5015
XANADU PROJECT
XANADU
PROJECT
Pertinax Prospect
– Gold in Soil
Pertinax
Prospect
- Gold
SoilGrid of Australia GDA 94 Zone 50
MRG Metals
Ltd August
2015.inMap
MRG METALS LTD. JUNE 2015. Map Grid of Australia GDA 94 ZONE 50
Figure 3.
3
MRGDrillholes
Drillholes
e 2015
2015 MRG
Drillholes
e Historic
Historic Drillholes
MRGTenement
Tenement
North
East
Boundary
MRG
North
East
Boundary
Fault
Fault
•Newman
6 august 2015 ASX ANNOUNCEMENT
Significantly, the drilling revealed an alteration halo, notably in arsenic, of a similar tenor to that found enveloping the
Mt Olympus mine. A geochemical analysis of MRG’s drill results provide an identifiable ‘Alteration Index’ showing the
values returned fall within the range as those from the Mt Olympus mine (Figure 4). Note that the Mt Olympus samples
are gold ore, the samples from MRG prospects are mineralised drill samples, hence are of a lower magnitude.
Mt Olympus Type
Alteration
9
f Pertnax
f Cleopatra
f Claudius
f Stynes
f Cleopatra North
f Caesar
f Amphitheatre
f Mark Anthony
f Mt Olympus
8
7
RANGE
6
5
4
3
2
1
XDHF03
Figure 4. Box-and-whisker plot comparison of Alteration Index (As-Au-Pb-Cu-Sb-Ag-Mo-Cr) computed for MRG Metals Ltd RC drilling and values computed for Ore
samples from Mt Olympus Deposit.
Preliminary results from the first holes at Pertinax are highly encouraging. They reveal a similar order of multi-element
anomalies to the adjacent Mt Olympus mine, warranting acceleration of further holes in this prospect.
FURTHER SOIL SAMPLING
An extended soil sampling program also commenced over the north east extension of the Pertinax prospect and
easterly extension of Cleopatra (see Figure 1). Both of these areas have been largely ignored by previous explorers.
Initial results have revealed anomalism in both these areas and further infill soil sampling is planned in order to define
drill targets.
XANADU PROJECT BACKGROUND
MRG’s Xanadu project is located close to the northern margin of the Ashburton Basin, some 4km west northwest of
Northern Star’s Ashburton project, (21.3Mt @ 2.4g/t Au for 1.67Moz). The Xanadu mineralisation was discovered in the
mid-1980s by BP Minerals and subject to various phases of exploration in the ensuing period until acquired by MRG
in 2011. Three dimensional structural modelling and a detailed analysis of the exploration database compiled for MRG
by our technical consultants Sasak Technical Services (‘Sasak’), provided an enhanced understanding of geological
controls on mineralisation, to better target prospect scale drilling.
Results from the recent drilling has confirmed the methodical approach of utilising Sasak’s technology. MRG will
continue to apply its technological advantage across the Xanadu project area to optimise future exploration.
The information in this report, as it relates to Exploration Results is based on information compiled and/or reviewed by Mr Keith Weston, who is a member of the
Australasian Institute of Mining and Metallurgy (AusIMM).
Mr Weston is an employee to the Company and has the relevant experience with the mineralisation reported on to qualify as a Competent Person as defined in the 2012
Edition of the “ Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves “. Mr Weston consents to the inclusion in the report of the
matters based on the information in the form and context in which they appear.
4
6 august 2015 ASX ANNOUNCEMENT
Appendix 1.
Table 1 Significant drill results
Hole_ID
From
To
Interval
m
Au
g/t
As
ppm
Cu
ppm
Pb
ppm
Sb
ppm
Pertinax
78
85
7
0.40
192
95
242
10.8
79
80
1
1.33
833
334
779
14.0
34
47
13
0.19
594
292
1025
39.7
X5006
20
25
5
0.59
139
362
72
11.3
X5007
31
43
12
0.11
703
45
142
12.1
X5008
29
36
7
0.30
1519
58
122
7.7
X5009
20
40
20
0.74
607
57
146
17.5
X5015
Inc.
X5017
Cleopatra
Inc.
33
37
4
3.44
1094
88
166
23.6
X5010
75
80
5
0.86
395
18
172
10.0
X5011
65
70
5
0.19
920
126
104
9.9
X5012
45
63
18
0.80
738
47
100
7.1
50
55
5
1.70
883
48
175
6.7
35
40
5
0.17
83
88
43
6.2
X4017
21
44
23
1.14
623
59
84
10.7
X4018
20
61
41
0.44
789
40
90
9.3
Inc.
X5013
MRG 2014 holes
Table 2 Xanadu Project Collar locations
Hole_ID
Easting
m
Northing
m
Elevation
m
Azimuth
Dip
Hole
Depth
Pertinax
X5001
583053
7409138
377
004
-60
65
X5002
583046
7409085
377
005
-60
120
X5003
583031
7409158
373
004
-60
84
X5004
581932
7409795
369
360
-60
90
101
X5005
583052
7409317
372
180
-60
X5014
582817
7409055
381
360
-60
84
X5015
582814
7409014
374
360
-60
96
114
X5016
582807
7409093
386
360
-60
X5017
582095
7409620
397
360
-60
84
X5018
582083
7409656
381
180
-60
96
X5019
582302
7409136
372
180
-60
60
586798
7406351
390
210
-60
90
Cleopatra
X5006
X5007
586778
7406317
396
210
-60
66
X5008
586750
7406274
398
210
-60
66
X5009
586735
7406238
400
210
-60
60
X5010
586611
7406365
397
210
-60
96
X5011
586577
7406298
398
210
-60
76
X5012
586535
7406246
403
210
-60
66
X5013
586809
7406271
400
210
-60
54
X4017
586388
7406281
406
360
-60
93
X4018
586600
7406150
407
360
-60
86
5
6 august 2015 ASX ANNOUNCEMENT
Appendix 2.
JORC CODE, 2012 EDITION – TABLE 1 REPORT - XANADU RC DRILLING JUNE 2015
Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes,
or handheld XRF instruments, etc). These examples
should not be taken as limiting the broad meaning of
sampling.
Include reference to measures taken to ensure sample
representation and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that
are Material to the Public Report.
In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other cases more
explanation may be required, such as where there
is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of
detailed information.
The sampling has been carried out using Reversed Circulation drilling (RC). A
total of 19 holes were drilled in the program, at depths ranging from of 54 to
120m. The holes were all drilled at - 60 degrees at various azimuths. Sample
quality was generally good with only minimal (estimated up to 15%) sample
loss around the annulus in the top 6m of each hole. A few holes intersected
the water table, causing reduced sample recovery in a few instances as
noted below.
The drill holes were located by handheld GPS. Sampling was carried out
under MRG Metals Ltd protocols and QAQC procedures as per current
industry practice. See further details below.
RC holes were drilled with a 4.5inch face-sampling bit, 1m samples collected
through a cyclone and splitter, to form a 2 to 3kg sub sample. At assay
laboratory the whole sample was crushed, then a 200 gram sub sample was
pulverised in a vibrating disc pulveriser. Au, Pt, Pd, Al, Ca, Co, Cr, Cu, Fe, K,
Mg, Mn, Na, Ni, Ti, Zn were determined by Inductively Coupled Plasma (ICP)
Optical Emission Spectrometry. Ag, As, Bi, Mo, Pb, Sb, Sn & Zr were determined
by Inductively Coupled Plasma (ICP) Mass Spectrometry. The samples were
analysed by Firing a 40 gm (approx) portion of the sample following digestion
with a mixture of Acids including Hydrofluoric, Nitric, Hydrochloric and
Perchloric Acids. This extended digest approaches a total digest for many
elements however some refractory minerals are not completely attacked.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by what
method, etc).
Method of recording and assessing core and chip
sample recoveries and results assessed.
An Hydco 350 Reverse Circulation drilling rig, operated by Orbit Drilling Pty
Ltd was used to collect the samples.
Drill sample
recovery
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of fine/
coarse material.
Logging
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to
support appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in Logging of RC chips records lithology, mineralogy, mineralisation,
nature. Core (or costean, channel, etc) photography.
weathering, colour and other features of the samples. All samples are wetsieved and stored in chip trays. These trays were photographed and then
stored for future reference.
The total length and percentage of the relevant
intersections logged.
6
The majority of samples were dry. Groundwater was encountered in lower
part of some holes and the inflow was controlled by increasing the air
volume. Sample recoveries were visually estimated and any low recoveries
recorded in the drill logs. Recovery of the samples was good, generally
estimated to be full, except for some sample loss from the annulus of the
hole.
RC face-sample bits, PVC casing in at least the top 6 metres and dust
suppression were used to minimise sample loss. RC samples were collected
through a cyclone and cone splitter, with one or two sub samples up to 3kg
each collected from each metre of drilling. The sub sample was dispatched
to the assay laboratory for analysis.
Occasional ground water egress into the hole resulted in some damp and
occasional wet samples, notably at the change of drill rods. Except for a few
exceptions no significant loss of sample volume was noted when water was
encountered. Any low volume samples were noted in the drill logs. Apart
from the wet samples there is no evidence for excessive loss of material
and the assay results do not indicate bias due to sample loss or cross
contamination.
All chips were geologically logged by MRG geologists, using the MRG logging
scheme.
All holes were logged in full.
6 august 2015 ASX ANNOUNCEMENT
Criteria
JORC Code explanation
Commentary
Sub‐sampling
techniques and
sample preparation
If core, whether cut or sawn and whether quarter,
half or all core taken.
No core was collected.
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
One-metre drill samples are channeled through a cone-splitter installed
directly below a rig mounted cyclone. One or two 2-3 kg sub-samples were
collected in a calico bags with the balance stored on site. Most samples
were dry, except in deeper parts of the hole where some samples were
damp and occasionally wet as previously noted.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Samples were prepared at the Bureau Veritas Laboratory in Perth. Samples
were dried, and the whole sample pulverised to 90% passing 75um, and a
reference sub-sample of approximately. 200g retained. A nominal 40g was
used for the analysis. The procedure is industry standard for this type of
sample.
Quality control procedures adopted for all subsampling stages to maximise representation of
samples.
A duplicate field sample is taken from the cone splitter at a rate of
approximately 1 in 90 samples. At the laboratory, regular Repeats and Lab
Check samples are assayed.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field duplicate/
second-half sampling.
One-metre samples are split on the rig using a cone splitter, mounted
directly under the cyclone. This standard Industry practice. The samples
weigh approximately 3kg prior to pulverisation.
Whether sample sizes are appropriate to the grain
size of the material being sampled.
Sample sizes are considered appropriate to give an indication of
mineralisation given the particle sizes and the practical requirement to
maintain manageable sample weights.
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
The samples were sorted and dried by the assay laboratory. The whole
sample was pulverised in a vibrating disc pulveriser. Au, Pt, Pd, Al, Ca, Co,
Cr, Cu, Fe, K, Mg, Mn, Na, Ni, Ti, Zn were determined by Inductively Coupled
Plasma (ICP) Optical Emission Spectrometry. Ag, As, Bi, Mo, Pb, Sb, Sn & Zr
were determined by Inductively Coupled Plasma (ICP) Mass Spectrometry.
The samples were analysed by Firing a 40 gm (approx) portion of the
sample following digestion with a mixture of Acids including Hydrofluoric,
Nitric, Hydrochloric and Perchloric Acids. This extended digest approaches
a total digest for many elements however some refractory minerals are not
completely attacked.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
No geophysical tools were used in this program.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(i.e. lack of bias) and precision have been established.
MRG QA/QC protocol for RC drilling is for Field Standards (Certified
Reference Materials) and Blanks inserted at a rate of 4 Standards and 3
Blanks per 100 single metre samples. Field duplicates were inserted at a
rate of approximately 1 in 90. For this document the relevant single metre
assays were part of a total batch of 369 samples submitted including QC
samples. This batch included 15 Blanks, 15 Standards, and 3 field duplicates.
At the Assay Laboratory additional Repeats, Lab Standards, Checks and
Blanks are analysed concurrently with the field samples. Results of the field
and Lab QAQC samples were checked on assay receipt. All assays met QAQC
protocols, showing no levels of contamination or sample bias.
The verification of significant intersections by either
independent or alternative company personnel.
Significant results were checked by the Exploration Manager and a
consultant Geochemist.
The use of twinned holes.
Twin holes were not employed during this part of the program.
Documentation of primary data, data entry
procedures, data verification, data storage (physical
and electronic) protocols.
All field logging was carried out on a Panasonic CF-19 Toughbook computer.
Logging data is submitted electronically to the Database Geologist in the
MRG Metals Ltd Victorian office. Assay files are received electronically
from the Laboratory. All data is stored in a Company database system, and
maintained by the Database Manager.
Discuss any adjustment to assay data.
No assay data was adjusted. The lab’s primary Au field is the one used for
analysis purposes. No averaging is employed.
Quality of assay
data and
laboratory tests
Verification of
sampling and
assaying
7
6 august 2015 ASX ANNOUNCEMENT
Criteria
JORC Code explanation
Commentary
Location of data
points
Accuracy and quality of surveys used to locate drill
holes (collar and down‐hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
RC collars locations were determined by hand-held GPS, with an accuracy
of 5m in Northing and Easting. No downhole surveys were completed on
this exploratory program. The drill rig mast is set up using a clinometer.
Currently, no follow-up down hole directional surveying is planned for these
holes.
Specification of the grid system used.
Grid projection is GDA94, Zone 50.
Quality and adequacy of topographic control.
Relative Levels are allocated to the drill hole collars using current Digital
Terrain Model’s for the area . The accuracy of the DTM is estimated to be
better than 10m.
Data spacing for reporting of Exploration Results.
RC drilling was designed to pierce geochemical targets. No grid based
drilling was undertaken. One sample was collected for every metre drilled
and selected samples submitted for assay.
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
This drilling was exploratory in nature and there are no current plans to
utilise the results for Mineral Resource estimation purposes.
Whether sample compositing has been applied.
Where sample compositing has been employed it is noted in the reported
results.
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the deposit
type.
The orientation of the drill hole (azimuth) is either 210°, 180° or 360°,
to allow for intersection of interpreted controlling fault structures or
lithological trends. At this stage of the program exploration information
suggests that the orientation of the geochemical anomalies is not accurately
known but likely oriented along the regional strike direction of 290° to 300°.
If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
The detailed orientation of any mineralisation is not accurately known
at this stage and the holes were drilled to check for the influence of
interpreted structures. Based on the current results no unexpected bias is
apparent.
Sample security
The measures taken to ensure sample security.
Individual calico sample bags were collected in pre -numbered plastic bags
(five calico bags per single plastic bag), sealed and transported by company
vehicle to the Centurion Transport depot located in Tom Price WA. The
plastic sample bags were then consolidated into Bulka Bags for ease of
transport and forwarded by Centurion Transport to the Bureau Veritas
Laboratory in Perth for assaying. Duplicate samples are stored on site.
Audits or reviews
The results of any audits or reviews of sampling
techniques and data.
Sampling and assaying techniques are industry-standard. No specific audits
or reviews have been undertaken at this stage in the program.
Data spacing and
distribution
Orientation of
data in relation to
geological structure
8
6 august 2015 ASX ANNOUNCEMENT
Section 2: Reporting of Exploration Results (Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral tenement
and land tenure
status
Type, reference name/number, location and
ownership including agreements or material issues
with third parties such as joint ventures, partnerships,
overriding royalties, native title interests, historical
sites, wilderness or national park and environmental
settings.
The RC drilling occurred within tenements P52/1374, P52/1375 &
P52/1380 held by MRG Metals (Australia) Pty Ltd, a wholly owned
subsidiary of MRG Metals Ltd. The licences are on Vacant Crown Land and
are located within the Yinhawangka Part B, WC2010/011 Native Title Claim
registered on 12 August 2010.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
Exploration done by Acknowledgment and appraisal of exploration by
other parties
other parties.
The tenements subject to this report are in good standing with the
Western Australian Department of Mines & Petroleum.
Previous exploration on this Project area has been completed by BP
Minerals, Nugold Hill Mines and Newcrest Ltd. Where relevant, data from
this earlier exploration has been incorporated into MRG databases.
Geology
Deposit type, geological setting and style of
mineralisation.
This drilling program at Xanadu was targeted towards Epithermal
style gold mineralisation. Based on exploration to date, gold occurs
within disseminated pyrite (oxidised near surface) in favourable clastic
sedimentary host rocks
Drill hole
Information
A summary of all information material to the
understanding of the exploration results including
a tabulation of the following information for all
Material drill holes:
• easting and northing of the drill hole collar
• elevation or RL (Reduced Level – elevation above sea
level in metres)
of the drill hole collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length.
If the exclusion of this information is justified on the
basis that the information is not Material and this
exclusion does not detract from the understanding
of the report, the Competent Person should clearly
explain why this is the case.
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade
truncations (e.g. cutting of high grades) and cut-off
grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths
of high grade results and longer lengths of low grade
results, the procedure used for such aggregation
should be stated and some typical examples of such
aggregations should be shown in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Refer to table in the body of text.
Data aggregation
methods
Grades are reported as down-hole length-weighted averages of grades. No
top cuts have been applied to the reporting of the assay results.
All higher grade intervals are included in the reported grade intervals.
No metal equivalent values are used.
Relationship
between
mineralisation
widths and intercept
lengths
These relationships are particularly important in the
reporting of Exploration Results.
If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should be
reported.
If it is not known and only the down hole lengths are
reported, there should be a clear statement to this
effect (e.g. ‘down hole length, true width not known’).
Diagrams
Appropriate maps and sections (with scales) and
Refer to Figures in the body of text.
tabulations of intercepts should be included for any
significant discovery being reported. These should
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
Where comprehensive reporting of all Exploration
All significant results are reported in the report..
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration
Results.
Balanced reporting
9
The geometry of the mineralisation at depth is not known at this stage. As
determined by surface mapping and previous drilling the mineralisation
predominantly occurs around anticlinal crests, where local dip is varies from
shallow to moderate steeply south west dipping to shallow to moderate
steeply north east dipping. (15 to 45 degrees). All assay results are based on
down-hole lengths, and true width of mineralisation is currently not known.
6 august 2015 ASX ANNOUNCEMENT
Criteria
JORC Code explanation
Other substantive
exploration data
Other exploration data, if meaningful and material,
Refer to body of text and this appendix.
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results;
bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
The nature and scale of planned further work (e.g.
Further exploration is planned over these tenements.
tests for lateral extensions or depth extensions or